Harnessing Oxbow Lakes for Sustainable Clean Water Supply in Semi-Urban Areas: A Nature-Based Solution
Abstract
The growing impact of climate change has increased the risk of global drought and poses a serious threat to clean water availability, particularly in semi-urban areas where infrastructure is often underdeveloped. This research investigates the potential of oxbow lakes to serve as adaptive, nature-based reservoirs for clean water provision and proposes an optimized predesign for a water supply system using EPANET 2.2. The case study focuses on an oxbow lake within the Krueng Tamiang watershed, with analysis centered on adjacent semi-urban areas that are both flood-prone and have a high demand for clean water. The system is designed based on a 20-year planning horizon (2025–2045). The findings suggest that by the year 2045, the projected maximum daily water demand in the study area will reach 49.05 L/s, with peak hourly demand up to 85.84 L/s. Simulation results show that the oxbow retention pond has the capacity to fulfill 30.87% of the area's total clean water needs for a period of 4.6 months during a single flood cycle. Additionally, hydraulic simulation results demonstrate that the proposed system satisfies velocity and pressure criteria under design and low-demand conditions, indicating stable performance throughout the planning period.
1 Introduction
Goal 13 of the Sustainable Development Goals (SDGs), focusing on climate action, encourages global efforts to strengthen resilience and adaptive capacity to climate-related hazards and natural disasters (UN 2023). Climate change increases the frequency of extreme hydrometeorological events such as floods and droughts (Tanaka et al. 2025; Basri et al. 2023; Azmeri et al. 2020), which often interact and exacerbate each other’s impacts. In particular, droughts caused by rising temperatures and shifting rainfall patterns have become a global concern as they threaten water availability in urban and semi-urban areas (Pizzorni et al. 2024; IPCC 2022; UN-Water 2022).
The threat of water scarcity is no longer limited to arid regions but also affects areas that have historically had sufficient water supplies. Globally, regions such as California (USA), Southern Europe, and even parts of Southeast Asia, once known for abundant water resources, are now frequently experiencing unprecedented periods of extreme drought, threatening agriculture, industry, and drinking water supply (WMO 2023; IPCC 2021). In many semi-urban areas, centralized water supply systems often fail to meet the community’s clean water needs, especially during extended dry seasons (World Bank 2023). This vulnerability highlights the need for a decentralized, adaptive, sustainable, and nature-based approach to water provision. Nature-based Solutions (NbS) is particularly relevant in ensuring water availability due to its adaptive, sustainable, and multifunctional nature (Agarwal and Bharat 2023). One implementation of the NbS concept is the utilization of oxbow lake areas as multifunctional retention ponds, which is a technical method for flood-drought disaster mitigation (Basri et al. 2023; Castellar et al. 2022; Oral et al. 2020).
An oxbow lake is a shallow, stagnant floodplain area (with no inflow or outflow) that has developed due to channel shifting and cutoff processes, among other geomorphic watershed processes. These areas hold great potential to be utilized as multifunctional retention ponds, including for clean water supply, flood control, and ecosystem conservation (Kusuma et al. 2026; Herawati et al. 2026; Thomas et al. 2021). Their large storage capacity and hydraulic connectivity with the main river flow as a continuous water source make oxbow lakes highly suitable for water retention and seasonal storage. These oxbow retention ponds function as cyclical reservoirs that effectively retain water to address drought threats (Azmeri et al. 2017). Oxbow lakes can reduce dependence on centralized treatment facilities and lower infrastructure costs due to their strategic location within river buffer zones.
However, the implementation of NbS through the utilization of oxbow lakes remains limited. Existing studies on oxbow lakes primarily focus on assessing their physical conditions and management strategies involving community participation and ecosystem considerations (Herawati et al. 2024; Chukwuka and Adeogun 2023). Meanwhile, in many regions, oxbow lakes are still neglected or misused, overgrown with wild vegetation, polluted, or irregularly repurposed. For instance, in Banda Aceh City, Indonesia, groundwater quality has declined due to the use of oxbow lakes as domestic wastewater storage sites. Similarly, the condition of oxbow lakes in Aceh Tamiang Regency, Indonesia, shows extensive vegetation growth and illegal use of river property areas (as shown in Figure 1). Poor management not only leads to ecological degradation but also limits the potential of oxbow lakes in climate adaptation and water resource resilience.
Therefore, this study aims to evaluate the potential use of oxbow lakes as decentralized, nature-based multifunctional retention ponds that simultaneously reduce flood impacts and provide clean water supply in semi-urban areas. Specifically, this study examines the technical feasibility of oxbow lakes, including their usable capacity, water quality potential, and predesign of water supply system using EPANET 2.2. This evaluation is expected to demonstrate how oxbow lakes can sustainably support community water needs. The findings of this research are expected to serve as a basis for formulating effective climate adaptation policies and strategies, as well as innovative water resource management practices, particularly in regions with similar geographical and social characteristics.

Figure 1 Condition of the oxbow lake in the Krueng Tamiang Watershed.
2 Materials and Methods
2.1 Study area
This study focuses on an oxbow lake located at coordinates 4.300972°N – 98.050722°E in the Krueng Tamiang Watershed (Figure 2). The Krueng Tamiang Watershed covers an area of 4,912.80 km² up to the river mouth. The oxbow extends from the upper reaches of the Tamiang River, with the oxbow lake point located downstream, covering an area of 4,581.02 km². The service area is a representative semi-urban region with unique characteristics: it has a relatively high population density, significant public facilities, and is classified as a medium-to-high drought risk zone, despite historically abundant water resources. Local statistical data (BPS-Statistics Aceh Tamiang Regency 2024) indicate a high concentration of activities in this region, which also has substantial clean water needs. Therefore, the oxbow lake at this site presents strong potential for development as a multifunctional retention pond capable of sustainably providing water reserves (as a cyclical reservoir).

Figure 2 Study location.
2.2 Data collection
This study utilized both primary and secondary data, covering the necessary parameters to evaluate the potential use of an oxbow lake as a decentralized, nature-based multifunctional retention pond for clean water supply in semi-urban areas. The data used were as follows.
- Elevation data, storage area, and storage volume, obtained from topographic surveys and used to analyze the storage capacity of the oxbow retention pond.
- Water quality test data of the oxbow, obtained from the Environmental Quality Testing Engineering Laboratory. The data were used as the basis for assessing the feasibility of the stored water as a clean water source. The water quality parameters, including biological, chemical, and physical conditions meet grade II of water quality standards. According to the Ministry of Health, this category is suitable for domestic and non-domestic water uses. The results also indicate that the stagnant condition of the oxbow lake does not pose a significant risk of contaminating the stored water within the retention pond system.
- Clean water service level data in the service area, obtained from the Aceh Tamiang Regency RISPAM (Drinking Water Supply System Development Plan) planning document (Dinas PUPR 2022) and used to determine the service level of the oxbow retention pond.
- Population data (2010–2024) as well as data on public facilities and infrastructure, obtained from the local statistics agency (BPS-Statistics Aceh Tamiang Regency 2024). These data were used to calculate the projected domestic and non-domestic clean water needs.
2.3 Oxbow retention pond capacity
Oxbow lake transformation into a retention pond is carried out by normalizing the bed elevation to 2.5 metres above sea level (masl). Subsequently, spillway with a crest at 5 metres above sea level is constructed based on hydrological conditions, particularly flood discharge for two return periods, which constitute the dominant source of inflow, as validated by historical rainfall and discharge data. The spillway aims to manage the dynamics of inflow and outflow. In this system, the oxbow lake is hydraulically reconnected to the main river and functions as a cyclical reservoir. Water replenishment primarily occurs during the wet season through river overbank flooding and controlled inflow when river stages exceed the spillway elevation, while outflow is regulated by the spillway structure. Moreover, overtopping caused by extreme flood water levels (7.14 meters above sea level) is prevented by an embankment with a crest elevation of 8 masl. On top of that, the capacity of the oxbow retention pond was calculated based on data obtained from a topographic survey. The graph represents the relationship between elevation, inundation area, and storage volume (Fuska et al. 2017). The physical characteristics of the reservoir are crucial, as its primary function is water storage (Azmeri et al. 2017; Azmeri et al. 2022) This storage serves as one of the main mechanisms for meeting various water needs, including clean water supply (Eriyagama et al. 2019). With the spillway elevation planned at +5 meters above sea level, the maximum storage volume is 1.14 million m³, and the inundation area is 418.95 × 10³ m² (Saida 2025). The pond capacity curve is shown in Figure 3.

Figure 3 Capacity curve of the oxbow retention pond.
2.4 Clean water demand analysis
The arithmetic method was used to project the population over the next 20 years (until 2045). This method was chosen because it is suitable for population data trends showing a constant (linear) increase and has the R² value closest to 1 (Langa et al. 2021; Ramos-Bueno et al. 2021) (Equation 1). This population projection was used to calculate domestic water demand. Non-domestic water demand was calculated based on infrastructure and facility data aligned with the regional spatial planning (Equations 2 to 4).
| (1) |
| (2) |
| (3) |
| (4) |
Where:
| Pn | = | population in the n-th year (people), |
| P0 | = | population in the initial year (people), |
| Tn | = | n-th year (y), |
| T0 | = | initial year (y), |
| ka | = | average population growth (people), |
| Q(DMI) | = | domestic water demand (L/s), |
| n | = | number of units, |
| q(N-DMI) | = | non-domestic unit consumption, |
| Q(N-DMI) | = | non-domestic water demand (L/s), |
| qSR | = | household connection unit consumption (litres/person/day), and |
| Qtotal | = | total water demand (L/s). |
The clean water planning criteria use the small city (semi-urban) category because the population ranges between 20,000 and 100,000 people. This semi-urban area is characterized by mixed land use, consisting of agricultural areas and urban infrastructure (Budiyantini and Pratiwi 2016). Furthermore, the service level was determined based on the percentage of unmet demand in the existing condition (30.87%). Water loss was assumed to be 20% of the total demand. The maximum water demand was then calculated using a multiplying factor of 1.2, while the peak hour water demand is calculated using a multiplying factor of 1.75 (Dinas PUPR 2022). These two multiplying factors were applied based on the results of previous analyses of the water supply system in the service area.
2.5 Principles of water supply system pre-design
The water supply system pre-design is developed to illustrate that oxbow pond could supply the furthest distribution point, covering the intake, transmission pipelines, and primary distribution network. The water supply system is performed on a 20-year design horizon (2025–2045), in accordance with national drinking water supply long-term planning regulations. In addition, the intake is placed in a stable location, and the use of a pump will be necessary when the intake elevation is lower than the production unit elevation. Furthermore, the transmission pipelines were sized according to the maximum daily water demand, while the distribution pipelines were determined by the peak hourly demand. The water network predesign adheres to the standards specified in the Guidelines for Technical Planning of Drinking Water Supply System Development. The acceptable water pressure within the pipes ranges from 10.34 m to 100 m, with flow velocities required to be between 0.3 m/s and 4.5 m/s (Kementerian PUPR 2016).
2.6 Hydraulic modeling using EPANET
Pipe flow hydraulics are simulated using EPANET 2.2 and validated against theoretical calculations. EPANET 2.2 is employed as a tool to simulate the hydraulic feasibility of the proposed predesign, including flow velocity evaluation, pressure distribution, and energy losses under design conditions. As the analysis focuses solely on technical hydraulic feasibility at the predesign stage, this simulation does consider the economic aspects, namely construction and operational costs.
The model represents a predesigned water supply system consisting of an intake point at the oxbow retention pond, a transmission pipeline, a water treatment plant tank, and a primary distribution pipeline. The network layout, pipe lengths, and node elevations were defined based on field measurements and topographic data, while diameters were determined by trial-error method. Pipe roughness values were assigned according to HDPE material properties, and hydraulic calculations were performed using the Darcy–Weisbach equation. A representative diurnal demand pattern was used solely to define peak-hour conditions (5:00–8:00 A.M. and 4:00–7:00 P.M.). The hydraulic simulation itself was conducted under steady-state conditions, focusing on peak-hour demand for the distribution system and maximum daily demand for the transmission system.
3 Results
3.1 Effective capacity of oxbow retention pond and clean water demand
The effective capacity of the oxbow retention pond is estimated at 606.42 × 10³ m³, determined by planning the spillway elevation at +5 masl and the clean water intake at +3.5 masl (selected by technical and land use constraint). This volume is considered sufficient to serve as a potential source of clean water supply. Population projections indicate that, in the next 20 years, the service area population will reach 61,111 people. The calculations show that the maximum daily water demand and peak hour demand are 49.05 L/s and 85.84 L/s, respectively. Figure 4 illustrates the relationship between population growth and clean water demand. Based on the analysis of the effective capacity of the oxbow retention pond and the maximum daily water demand, it is found that the effective capacity of 606.42 × 10³ m³ can meet the maximum daily water demand of 49.05 L/s or 131,385.01 m³/month for approximately 4.6 months per flood cycle, which accounts for around 38.3% of the annual clean water requirement.

Figure 4 Relationship between population projection and clean water demand.
3.2 Technical predesign of clean water supply system
The clean water supply system predesign involves selecting the location of a new Water Treatment Plant (WTP), predefining the transmission pipeline and main distribution network, and carrying out a comprehensive hydraulic analysis. The situational map of the WTP, the transmission pipe, and the primary distribution network is shown in Figure 5. The WTP is provisionally located at 4°18'27.95"N, 98°3'2.46"E with an elevation of +9 m, considering ease of service to the downstream oxbow area and adequate land availability. The 192‑m transmission pipe was preliminarily specified as HDPE, with an assumed roughness of 0.0015 mm. For a predefined intake discharge of 0.05 m³/s through a 200‑mm (0.2 m) diameter pipe, the calculated flow velocity is about 1.59 m/s. Consequently, energy head losses become critical to ensure sufficient pressure within the pipe. The Reynolds number (Re) was estimated at approximately 318,000, and the relative roughness (k/D) is 7.5 × 10⁻⁶. From these values, a friction factor (f) of 0.0142 is obtained from the Moody diagram. Thus, the major head loss (hf) over the 192 m pipeline is estimated to be 1.78 m. Additionally, the minor head loss (He) due to a contraction from the pond to the pipe (Bhave and Gupta 2006), with a loss coefficient k of 0.5, is about 0.064 m.

Figure 5 Clean water supply system layout.
Given that the WTP elevation is higher than the assumed intake elevation, a pump is essential. The calculated static head is 7 m, while the dynamic head, i.e., the sum of major and minor losses, is about 1.82 m, yielding an effective pump head (Heff) of 8.82 m. Based on this Heff, the required pump power is 5.9 horsepower (HP), equivalent to 4.34 kW. Using Bernoulli’s equation, the pressure at the water treatment plant tank is approximately 0.005 m. The energy grade line scheme is illustrated in Figure 6.

Figure 6 Energy loss line scheme on the transmission pipe.
The main distribution network was then defined in series and operated with a pumping system. The distribution pipes were sized using the peak-hour demand of 85.54 L/s (≈0.09 m³/s). With 300‑mm HDPE pipes, the resulting flow velocity is 1.24 m/s. The calculated total major head loss (Hf) is 27.91 m, and the minor head loss (He) is 0.039 m. From these, the effective head is 35.6 m, requiring a minimum pump power of 30.97 kW. Figure 7 presents the relationship between head and service area contours.

Figure 7 Relationship between head and service area contours.
4 Discussion
4.1 Interpretation of water demand and oxbow capacity
The effective capacity is a critical parameter in raw water source planning, referring to the volume of water that can be utilized from a reservoir between the minimum operational water level and the normal water level. This capacity is highly susceptible to reduction due to sediment accumulation (Ali and Shakir 2018). Oxbow lakes face a high risk of sedimentation because of their characteristics as cut-off river meanders, resulting in very slow water flow and a lack of sediment flushing mechanisms (Chukwuka and Adeogun 2023). To address this issue, the clean water intake is planned at an elevation of +3.5 masl as an initial measure against sedimentation. Converting the oxbow lake into a retention pond is expected to improve sediment management through a dynamic inflow and outflow system, which also enhances water quality for clean water supply purposes.
The analysis indicates that the effective capacity of the oxbow retention pond (606.42 × 10³ m³), holds significant potential for supporting clean water supply. Setting the spillway elevation at +5 masl and the clean water intake at +3.5 masl is a vital strategy to balance the dual functions of flood control and raw water provision. This approach aligns with the findings of Krivtsov et al. (2022), which highlight that urban ponds and surrounding green spaces play an essential role as part of blue-green infrastructure, contributing to various ecosystem services, including flood risk mitigation and improved runoff water quality, supporting the dual function of this oxbow retention pond. Based on Figure 4, the projected population growth over the next 20 years, reaching 61,111 people, will significantly increase clean water demand, with maximum daily requirements of 49.05 liters/person/day and peak hour requirements of 85.84 liters/person/day, resulting in a monthly water demand of 131,385.01 m³.
Although the analysis shows that the effective capacity of the retention pond can meet clean water needs for approximately ±4.6 months per flood cycle, or about 38.3% of the annual demand, its contribution remains highly significant as an alternative water source, especially during the dry season. White (2016) emphasized that the design of the intake system and elevation control is crucial for maximizing the utilization of water volume without compromising the flood retention function. However, the sustainability of this function largely depends on proper water quality management and periodic drainage strategies, which must be key considerations during implementation. Therefore, the dual function of the retention pond can operate synergistically, provided that optimal operational planning and maintenance are in place, including regular water quality monitoring and adjustments to future population dynamics.
4.2 Technical feasibility of water supply system and hydraulic parameters
The clean water distribution network was planned to use a pumping system, considering the service area’s varied topography. In line with piped water supply planning principles, when the elevation difference between the water source and the service area exceeds 3 m, a pump is required. The main distribution layout follows the road alignment (Bhave and Gupta 2006). Design feasibility was assessed by meeting velocity and pressure criteria; the calculated velocities in both transmission and distribution pipes comply. Velocities below 0.3 m/s can cause in-pipe sedimentation, narrowing of the cross-section, and reducing capacity.
Hydraulic simulation using EPANET 2.2 confirms that the predesigned transmission and distribution systems operate within acceptable hydraulic performance criteria. Under peak-hour demand conditions, flow velocities in the transmission and distribution pipelines remain within the recommended range (0.3–4.5 m/s), indicating stable flow conditions and low risk of in-pipe sedimentation (Bhave and Gupta 2006; Kementerian PUPR 2016). The minimum nodal pressure occurs at the furthest distribution point but remains above the minimum allowable pressure specified in national design standards, ensuring reliable water delivery throughout the service area. During low-demand conditions representative of early operational years, reduced flow rates result in lower head losses and increased nodal pressures (Hadi et al. 2025). However, simulated pressures remain below the maximum allowable limits, indicating that the system does not pose a risk of excessive pressure that could compromise pipe integrity. Pump operating points derived from the simulation indicate that both transmission and distribution pumps can maintain adequate head under varying demand scenarios, demonstrating the technical feasibility and hydraulic robustness of the proposed predesign.
Furthermore, several pipe diameter scenarios were simulated to verify the hydraulic performance of the proposed design (as shown in Figure 8). Table 1 presents the corresponding simulation results for both transmission and distribution pipelines. A smaller transmission pipe diameter increases flow velocity and major head loss (Hf), while reducing the pressure. Although the velocity (v = 2.83 m/s) still meets the design requirements, the occurrence of negative pressure indicates hydraulic instability and necessitates higher pump power. Conversely, larger diameters result in lower velocity and head loss; however, they increase material costs, which may affect economic feasibility. Similar trends are observed in the distribution system simulations. The variation in pipe diameter results in consistent hydraulic responses across the system. Flow velocity (v) and major head loss (Hf) increase as the diameter decreases and decrease as the diameter increases. In contrast, pressure exhibits an opposite trend, decreasing with smaller diameters and increasing with larger diameters.

Figure 8 EPANET 2.2 simulation results for transmission and distribution systems under different pipe diameter scenarios (150 mm, 200 mm, and 300 mm).
Table 1 Simulation results of transmission and distribution systems.
| Simulation Results of Transmission Pipelines | ||||
| Diameter (mm) | Velocity (m/s) | Unit head loss (m/km) | Total head loss (m) | Pressure (m) |
| 150 | 2.83 | 37.19 | 7.14 | -5.29 |
| 200 | 1.59 | 9.27 | 1.78 | 0.07 |
| 300 | 0.71 | 1.31 | 0.25 | 1.60 |
| Simulation Results of Primary Distribution Network | ||||
| Diameter (mm) | Velocity (m/s) | Unit head loss (m/km) | Total head loss (m) | Pressure (m) |
| 200 | 2.79 | 25.72 | 197.75 | -157.55 |
| 300 | 1.24 | 3.63 | 27.91 | 11.68 |
Thus, the 200 mm HDPE was used for the 192 m transmission pipe, selected for its corrosion resistance and very smooth interior (roughness 0.0015 mm). With a discharge of 0.05 m³/s, the flow velocity is about 1.59 m/s (within the ideal 0.6–2.5 m/s range for transmission systems). The estimated Reynolds number of 318,000 indicates fully turbulent flow, while the relative roughness (k/D) is very small, about 7.5 × 10⁻⁶, yielding a friction factor (f) of 0.0142 from the widely used Moody chart (Bhave and Gupta 2006). These values produce a major head loss (Hf) of 1.78 m, and a minor head loss (He) due to a contraction of about 0.064 m with a minor-loss coefficient of 0.05.
The results were compared with previous studies to contextualize the magnitude of the calculated head losses. The major head loss of 1.78 m calculated for the 192 m transmission pipe aligns well with Swono et al. (2020), who reported a major head loss of 1.071 m for a 72.8 m pipe, confirming that longer pipes incur greater friction losses. The effective pump head is chiefly influenced by elevation difference and pipe length: the larger the lift, the higher the required head. Swono et al. (2020) obtained a total pump head of 13.303 m for an elevation difference of 11.68 m, whereas in this study the required total pump head is smaller because the elevation difference is lower.
The main distribution network was predesigned to accommodate the peak-hour demand of 85.54 L/s (0.09 m³/s), using 300 mm HDPE pipes. The resulting flow velocity of 1.24 m/s is considered stable and safe. The major energy loss for the distribution system was calculated at 27.91 m, with an additional minor loss of 0.039 m. This results in a total effective pump head of approximately 34 m, requiring a minimum pump capacity of 40.8 HP (30.42 kW). Energy loss analysis is a crucial aspect of this predesign to ensure adequate water pressure at all points in the network while minimizing energy losses. This aligns with the findings of Brentan et al. (2024), who emphasized that optimal pump operation simultaneously considers both energy efficiency (related to its cost) and water quality (ensuring adequate pressure head availability across varying network demands).
Beyond hydraulic feasibility, long-term system performance is closely linked to water quality and sediment management within the retention pond. The findings of Liu et al. (2025) on climate uncertainties, which can trigger variations in retention flow, highlight the need for a system adaptable to both dry and wet seasonal patterns. Therefore, periodic evaluations of the retention pond’s capacity, reserve water volume, and population demand projections must be conducted to ensure that the clean water distribution design remains optimal in the long term. Figure 7 further illustrates how the topography of the service area significantly influences pump head losses, particularly at points with steep contour elevations, which become critical factors in determining the effective pump head. The most extreme head drop occurs between distances of 3.6 m and 4.1 m, where a reduction of approximately 4 m is observed due to rising contour levels starting from 2.9 m. At sharper contour rises, such as at 6.4 m and 6.9 m, the pump head tends to decrease gradually, as the contours preceding these extreme points are relatively low, preventing significant head loss within these lower elevation ranges.
5 Conclusion
Based on the analysis, the Krueng Tamiang oxbow retention pond is capable of supplying approximately 38.3% of the annual clean water demand. The estimated maximum daily clean water requirement at the study site is 49.05 L/s, with a peak-hour demand of 85.84 L/s. With a maximum storage capacity of 1.15 million m³ at a spillway elevation of +5 masl, and clean water extraction planned at +3.5 masl, the effective capacity of the pond is 606.42 × 10³ m³. This volume can meet clean water needs for approximately ±4.6 months per flood cycle. The clean water pipeline system is predesigned using HDPE material, consisting of two main lines: transmission and distribution. The transmission line conveys water from the oxbow retention pond to the treatment plant through a 200 mm diameter pipe, supported by a low-power pump with an effective head adjusted to the elevation requirements. The main distribution line uses a 300 mm diameter pipe equipped with a high-pressure pump to ensure flow continuity and adequate pressure across the service area. This planning demonstrates the technical feasibility of utilizing the oxbow pond as an alternative raw water source to strengthen clean water resilience in drought-affected regions. This study highlights the potential of oxbow ponds as a NbS for clean water reserves, particularly for drought risk mitigation. However, it should be noted that cost and sedimentation aspects of the pond have not yet been evaluated and require further study.
Acknowledgments
This research was financially supported by Universitas Syiah Kuala, through the scheme of Professor Incentive Grant, under contract No. 69/UN11.2.1/PG.01.03/SPK/PTNBH/2024, dated May 3, 2024. The authors also wish to thank the Department of Civil Engineering, Universitas Syiah Kuala, and all field contributors who supported the data collection in Aceh Tamiang watershed.
References
- Agarwal, D.S. and A. Bharat. 2023. "Nature-Based Solutions for flood–drought mitigation using a composite framework: A case-based approach." Journal of Water and Climate Change 14 (3): 778–795. https://doi.org/10.2166/wcc.2023.369
- Ali, M. and A.S. Shakir. 2018. "Sustainable Sediment Management Options for Reservoirs: A Case Study of Chashma Reservoir in Pakistan." Applied Water Science 8, 103. https://doi.org/10.1007/s13201-018-0753-3
- Azmeri, A., I.K. Hadihardaja, N. Shaskia, and K.S. Admaja. 2017. "Completion of Potential Conflicts of Interest through Optimization of Rukoh Reservoir Operation in Pidie District, Aceh Province, Indonesia." AIP Conference Proceedings 1903, 1. https://doi.org/10.1063/1.5011611
- Azmeri, A., D.A. Sundary, C. Mutiawati, and H.A. Rani. 2022. "An Update on Reservoir Operating Rules Following Changes on the Effective Capacity Due to Land Erosion." E3S Web of Conferences 340, 01008. https://doi.org/10.1051/e3sconf/202234001008
- Azmeri, A., H. Yunita, S. Safrida, I. Satria, and F.Z. Jemi. 2020. "Physical Vulnerability to Flood Inundation: As the Mitigation Strategies Design." Journal of Water and Land Development 46 (134194): 20–28. https://doi.org/10.24425/jwld.2020.134194
- Basri, H., S. Sufardi, H. Helmi, S. Syakur, S. Sugianto, A. Azmeri, and H. Helmi. 2023. "Drought and Water Availability Analysis for Irrigation and Household Water Needs in the Krueng Jrue Sub-Watershed." PeerJ 11, e14830. https://doi.org/10.7717/peerj.14830
- Bhave, P.R. and R. Gupta. 2006. Analysis of Water Distribution Networks. Oxford, U.K.: Alpha Science International.
- BPS-Statistics Aceh Tamiang Regency. 2024. Aceh Tamiang Regency in Figures 2024. Aceh Tamiang: BPS-Statistics Aceh Tamiang Regency.
- Brentan, B., F. Mota, A. Menapace, A. Zenfei, and G. Meirelles. 2024. “Optimizing Pump Operations in Water Distribution Networks: Balancing Energy Efficiency, Water Quality and Operational Constraints.” Journal of Water Process Engineering 63, 105374. https://doi.org/10.1016/j.jwpe.2024.105374
- Budiyantini, Y. and V. Pratiwi. 2016. "Peri-urban Development in Bandung Metropolitan Area." Procedia – Social and Behavioral Sciences 227, 833–837. https://doi.org/10.1016/j.sbspro.2016.06.152
- Castellar, J.A.C., A. Torrens, G. Buttiglieri, H. Monclús, C.A. Arias, P.N. Carvalho, et al. 2022. "Nature-Based Solutions Coupled with Advanced Technologies: An Opportunity for Decentralized Water Reuse in Cities." Journal of Cleaner Production 340, 130660. https://doi.org/10.1016/j.jclepro.2022.130660
- Chukwuka, A.V. and A.O. Adeogun. 2023. "Oxbow Lakes in Africa: Status, Threats, and Management Strategies—A Review." Environmental Challenges 13, 100759. https://doi.org/10.1016/j.envc.2023.100759
- Dinas Pekerjaan Umum dan Perumahan Rakyat (PUPR). 2022. “Perencanaan Penyusunan RISPAM Kabupaten Aceh Tamiang, Laporan Akhir [Final Report on Regional Drinking Water Supply System Plan, Aceh Tamiang].” Aceh Tamiang. In Indonesian.
- Eriyagama, N., V. Smakhtin, and L. Udamulla. 2019. "How Much Artificial Surface Storage is Acceptable in a River Basin and Where Should it be Located: A Review." Earth-Science Reviews 208, 103294. https://doi.org/10.1016/j.earscirev.2020.103294
- Fuska, J., D. Kubinský, K. Weis, L. Lackoová, J. Pokrývková, M. Leitmanová, and T. Panagopoulos. 2017. "Area-Storage Capacity Curve of Historic Artificial Water Reservoir Ottergrund, Slovakia – Assessment of the Historical Data with the Use of GIS Tools." Journal of Ecological Engineering 18 (1): 49–57. https://doi.org/10.12911/22998993/66237
- Hadi, Q.H.A., K.N Sayl, and A.A. Ali. 2025. “Assessment of Flow Velocity and Its Effects on and Network Efficiency by WaterGEMS and GIS Case Study of Ramadi City.” Anbar Journal of Engineering Sciences 16 (2): 36–41. https://doi.org/10.37649/AJES-25-012
- Herawati, H., A.A. Akbar, E. Yulianto, J. Sudrajat, B. Utomo, Y. Sholva, E. Hidayah, et al. 2026. “The Effectiveness of Oxbow Lake Restoration as a Flood Reduction Nature-Based Solution (NbS) in the Kapuas River Basin, Indonesia.” Engineering, Technology & Applied Science Research 16 (1): 31678–31683. https://doi.org/10.48084/etasr.15737
- Herawati, H., Kartini, E. Yulianto, Y. Lestyowati, Juliastuti, and D. Ariva. 2024. "Dominant Conservation Parameters to Control Environmental Destruction of Oxbow Lake in Kapuas River Basin, Indonesia." IOP Conference Series: Earth and Environmental Science 1343, 012010. https://doi.org/10.1088/1755-1315/1343/1/012010
- IPCC. 2021. “Climate Change 2021: The Physical Science Basis.” Available online: https://www.ipcc.ch/report/ar6/wg1/
- IPCC. 2022. "Fact Sheets | Climate Change 2022: Impacts, Adaptation and Vulnerability." Available online: https://www.ipcc.ch/report/ar6/wg2/about/factsheets/
- Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR). 2016. "Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 27 Tahun 2016 tentang Penyelenggaraan Sistem Penyediaan Air Minum." In Indonesian. Jakarta, Indonesia.
- Krivtsov, V., H. Forbes, S. Birkinshaw, V. Olive, D. Chamberlain, J. Buckman, R. Yahr, et al. 2022. "Ecosystem Services Provided by Urban Ponds and Green Spaces: A Detailed Study of a Semi-Natural Site with Global Importance for Research." Blue-Green Systems 4 (1): 1–23. https://doi.org/10.2166/bgs.2022.021
- Kusuma, M.S. Badri., F. Isma, E.O. Nugroho, M.B. Adityawan, and A. Azmeri. 2026. “An Assessment Of Mangrove Restoration Contribution for Compound Flood Risk Reduction in Built Estuary Area Based on A Hydrodynamic Model.” Nature-Based Solutions 9, 100295. https://doi.org/10.1016/j.nbsj.2025.100295
- Langa, C., J. Hara, J. Wang, K. Nakamura, N. Watanabe, and T. Komai. 2021. "Dynamic Evaluation Method for Planning Sustainable Landfills Using GIS and Multicriteria in Areas of Urban Sprawl with Land-Use Conflicts." PLoS ONE 16 (8): e0254441. https://doi.org/10.1371/journal.pone.0254441
- Liu, J., J. Zhai, J. Duan, C. Jiang, Z. Zhang, Q. Wang, J. Zhao, and T. Wang. 2025. "Adaptive Reservoir Operation Considering Real-time Forecasting: Application of Two-stage Coordinated Control Risk Hedging Principle." Water Resources Management 39, 6633–6666. https://doi.org/10.1007/s11269-025-04264-w
- Oral, H.V., P. Carvalho, M. Gajewska, N. Ursino, F. Masi, E.D. van Hullebusch, J.K. Kazak, et al. 2020. "A Review of Nature-Based Solutions for Urban Water Management in European Circular Cities: A Critical Assessment Based on Case Studies and Literature." Blue-Green Systems 2 (1): 112–136. https://doi.org/10.2166/bgs.2020.932
- Pizzorni, M., A. Innocenti, and N. Tollin. 2024. "Droughts and Floods in a Changing Climate and Implications for Multi-Hazard Urban Planning: A Review." City and Environment Interactions 24, 100169. https://doi.org/10.1016/j.cacint.2024.100169
- Ramos-Bueno, A., M. Perevochtchikova, and H. Chang. 2021. "Socio-Spatial Analysis of Residential Water Demand in Mexico City." In Spanish. Tecnologia y Ciencias del Agua 12 (2): 59–110. https://doi.org/10.24850/J-TYCA-2021-02-02
- Saida, M.R. 2025. “Analisis Flood Routing Pemanfaatan Kolam Oxbow pada DAS Krueng Tamiang [Flood Routing Analysis of Oxbow Pond Utilization in Krueng Tamiang].” In Indonesian. Undergraduate Thesis, Universitas Syiah Kuala, Banda Aceh, Indonesia.
- Swono, W., A.U. Ryadin, and Q. Nurlaila. 2020. “Perancangan Sistem Perpipaan untuk Distribusi Air Bersih di Fakultas Teknik Universitas Riau Kepulauan Batam [Design of a Piping System for Clean Water Distribution at the Faculty of Engineering, Universitas Riau Kepulauan Batam].” In Indonesian. Sigma Teknika 3 (2): 107–120.
- Tanaka, K., K. Akaishi, and T. Yokota. 2025. "Public Preferences for Flood Warning Improvements: An Inferred Valuation Approach Addressing Social Desirability Bias." International Journal of Disaster Risk Reduction 126, 105571. https://doi.org/10.1016/j.ijdrr.2025.105571
- Thomas, S.S., J.A. Constantine, D. Dethier, J.W. Thoman, J. Racela, E. Blau, and J.D. Landis. 2021. "The Importance of Oxbow Lakes in the Floodplain Storage of Pollutants." Geology 50 (4): 392–396. https://doi.org/10.1130/G49427.1
- United Nations. 2023. “The Sustainable Development Goals Report 2023 Special Edition.” United Nations, New York, NY, USA. Available online: https://sdgs.un.org/sites/default/files/2023-07/The-Sustainable-Development-Goals-Report-2023_0.pdf
- UN-Water. 2022. "UN-Water World Water Development Report 2022. Groundwater. Making the Invisible Visible." UNESCO, Paris, France. https://www.un.org/sites/un2.un.org/files/un_world_water_dev._report_2022.pdf
- White, F.M. 2016. Fluid Mechanics. 8th ed. New York: McGraw-Hill Education.
- World Bank. 2023. “Annual Report 2023.” The World Bank, Washington, DC, USA. Available online: https://www.worldbank.org/en/about/annual-report-2023
- World Meteorological Organization (WMO). 2023. “State of Global Water Resources Report 2023.” World Meteorological Organization, Geneva, Switzerland. Available online: https://wmo.int/resources/publication-series/state-of-global-water-resources/state-of-global-water-resources-2023