We noticed that you're not using the latest version of your browser. You'll still be able to use our site, but it might not work or look the way it's supposed to. We recommend upgrading your browser.
JWMM
ABOUT
PAPERS
AUTHORS
REVIEWERS
RESOURCES
Menu LOGIN
Software
Tap in to water management modeling that excels. PCSWMM is flexible, easy to use and streamlines your workflow – saving you time and resources.
Training
Beginner or seasoned user, our flexible training options help you understand and master the full capabilities of both EPA SWMM5 and PCSWMM.
Community
There's a whole community to support you - find solutions, view code and more.
OPEN SWMM
OPEN EPANET
Journal
Our peer-reviewed, open-access Journal of Water Management Modeling. Expand your knowledge, get insights and discover new approaches that let you work more effectively.
Conference
The International Conference on Water Management Modeling. Meet your colleagues, share your experiences and be on the forefront of advances in our profession.
Consulting
Not sure how to solve a complex water management issue? Put our experience, knowledge, and innovation to work for you.
  • PAPERS
  • AUTHORS
  • REVIEWERS
  • ABOUT
  • SEARCH
  • RESOURCES
    Software
    Training
    Community
    OPEN SWMM
    OPEN EPANET
    Journal
    Conference
    Consulting

JWMM Login

Verifying credentials wait Don't have an account?
Forgot your password?

Site Management and Stormwater Controls Over Twenty-Five Years at an Industrial Site, Part 1

Robert E. Pitt , M. Straight, S. Isaac, Brandon Steets, Megan Otto, Robert Gearheart, Jonathan Jones, Michael Josselyn and Michael K. Stenstrom (2026)
University of Alabama (retired), USA
GeoSyntec Consultants, USA
California State Polytechnic University, USA
Wright Water Engineers Inc., USA
WRA Consultants, USA
University of California, USA
DOI: https://doi.org/10.14796/JWMM.C600
comment Discussion

Collapse all
Collapse all

Abstract

This paper describes the Santa Susana Field Laboratory and historical site activities, agency-approved interim contaminated soil and material removal, and stormwater management and resulting runoff quality that occurred before the California Department of Toxic Substances Control final clean-up guidance becomes available. This is a unique case study with stormwater samples collected during every runoff event and analyzed for a very broad analytical suite over a period of about twenty-five years at regulated stormwater outfalls, and less frequently at many additional locations within the site, combined with an independent surface water expert panel to support constructive discharger-regulator-public communication and science-based decision making. The use of a variety of allowed interim contaminated soil and material removal actions, in addition to active stormwater treatment, plus distributed passive stormwater controls, were complemented with pollutant source investigations and a statistical spatial screening approach to prioritize critical drainage areas for stormwater treatment. Public involvement included participation in discharge permit hearings, reviews of regulatory agency planned clean-up goals, and attendance at informational meetings, in addition to other activities. This paper is part one of a two-part set. The second paper describes the significant improvements in stormwater quality from the site as these controls have been implemented.    

1 Objective

The purpose of this paper is to compile information from many sources describing the history of interim contaminated soil and material removal and stormwater management at the Santa Susana Field Laboratory (SSFL), as the CalEPA/DTSC (California Environmental Protection Agency, Department of Toxic Substances Control) develops the final site clean-up goals and processes. This paper describes a unique industrial stormwater case study for a large historical aerospace and energy field laboratory with stormwater data collected over a period of about twenty-five years at regulated outfalls and at many additional locations within the watersheds to identify sources of stormwater contamination and the best locations for distributed stormwater controls. Data are available in the discharge monitoring reports submitted to the regulatory agencies (Boeing 2021a; 2021b; 2022a; 2022b, for example). Members of the public and regulators, amongst others, who are very interested in SSFL stormwater quality and impacts on the surrounding communities, may not be aware of many of these site interim clean-up activities that have occurred during the lengthy regulatory process before final clean-up can occur. In addition, stormwater professionals may be interested in the activities and methods used by the SSFL Surface Water Expert Panel (SWEP) during this time. The SWEP member candidates were reviewed and approved by the Regional Water Quality Control Board and local environmental groups. This paper describes these stormwater management activities while the second paper in this two-paper series presents the overall stormwater quality trends at the regulated outfall conditions over a 25-year period in response to these site changes and stormwater treatment. Stormwater monitoring at SSFL has been extensive, as required to comply with the stormwater-only NPDES discharge permit at regulated outfalls, in addition to other targeted monitoring, such as to identify sources of problem pollutants and to verify performance of stormwater controls. Two prior papers (Pitt et al. 2021; 2022) described the development and designs of the distributed stormwater controls, including the development and testing of a unique stormwater treatment media used at these controls, and the performance of these stormwater controls, in detail.

The Santa Susana Field Laboratory has been studied for many years by regulatory agencies (US Environmental Protection Agency (EPA), CalEPA/DTSC, and the Los Angeles Regional Water Quality Control Board (LARWQCB)) and site owners/operators (US Department of Energy (DOE), the Boeing Company, and the National Aeronautics and Space Administration (NASA)) in order to prepare a clean-up plan to remove contaminated soils from the site and to remediate contaminated groundwater. During this long period, the LARWQCB has regulated stormwater quality from the site to protect downstream beneficial uses. There have been many interim clean-up operations on the site, mainly to remove surface structures and some contaminated soils that had potential to pose an immediate stormwater hazard. Many citizen groups have also been very active in participating in this lengthy process. However, the information describing these interim clean-up activities and monitoring reports are located at many different internet locations, making it difficult to understand the overall activities that have occurred on the site. This paper outlines these site activities and references internet locations for further information. The role of stormwater management during these activities is also described in this paper, while the associated Part 2 paper evaluates the improvements in stormwater quality during the monitoring of more than 220 runoff events at the outfalls.

There are many internet resources that have articles pertaining to the clean-up process at SSFL. As an example, CalEPA/DTSC, the public agency responsible for developing and overseeing the final clean-up operations at the site, has more than 1,600 articles on their website (CalEPA 2024a), and the Los Angeles Regional Water Quality Control Board (LARWQCB 2024a) has about 700 articles pertaining to SSFL. In addition, the site owners also have hundreds of articles and monitoring reports and other information on their websites, including Boeing (2024e), NASA (2024d), and DOE (2024a). In addition, there are many public interest groups that also have websites containing articles addressing issues associated with SSFL. The LARWQCB (2024b) and the Boeing (2024f) websites contain reports submitted and public presentations describing the performance of the stormwater management program.

As part of the stormwater regulatory process, the LARWQCB has assembled an independent panel of experts to provide technical oversight of the SSFL stormwater management activities. Some of the Surface Water Expert Panel activities include the following, with many of the panel’s technical reports available at Boeing (2024g), including:

  • Development of stormwater pollutant source assessment reports for metals and dioxins, which included reviews of historical monitoring data at SSFL and other areas.
  • Development of a stormwater treatment media blend for use in vegetated and unvegetated media filters at SSFL targeting site-specific constituents of concern (COC).
  • Designed and directed periodic source area studies to prioritize critical subwatershed locations suitable for stormwater treatment.
  • Developed conceptual designs of stormwater controls suitable for many critical locations, with annual updates including assessments of maintenance improvement needs.
  • Helped prepare and review annual reports describing the performance of source area stormwater controls and the discharge stormwater quality at regulated outfalls.
  • Helped design and review special studies examining other sources of potential stormwater contaminants (e.g., atmospheric dustfall, treated wood, asphalt pavement runoff, wildfire ash.)
  • Reviewed stormwater human health risk assessment reports.
  • Reviewed data collected after the Woolsey Fire, including watershed recovery options.
  • Conducted annual site visits and public meetings to discuss stormwater quality at SSFL, including performance of the stormwater controls.
  • Reviewed and commented on site and soil excavation project-specific construction stormwater pollution control plans.

The primary role of the SWEP is addressing surface water (not groundwater) issues. There is a separate Groundwater Expert Panel whose focus is on the many groundwater issues at the site, including the fate and transport of groundwater constituents of concern, groundwater treatment, and monitoring of seeps and springs.

This paper includes the following information describing site background and activities at SSFL affecting stormwater while the final clean-up plan is being developed:

  • Site description and historical activities associated with SSFL contamination:
    • Site clean-up and environmental regulations
    • Interim contaminated material removal
    • Non-industrial sources affecting SSFL stormwater
  • Public involvement
  • Human health risk assessment for stormwater
  • Stormwater treatment at SSFL:
    • Identification of critical subwatersheds and use of distributed stormwater controls
    • Sources of stormwater constituents of concern
    • Performance of stormwater controls

The associated Part 2 paper (Outfall Quality Changes Over Twenty-five Years at an Industrial Site in Response to Stormwater Controls) is a follow-up evaluation and discussion of how these interim site clean-up and stormwater management activities have improved the stormwater quality at the regulated outfalls at SSFL over time. At the time this paper was prepared, more than 220 runoff events have been monitored, with more than 40,000 separate concentration measurements having permit limits, at SSFL. Outfall stormwater quality before and after the site interim activities and stormwater controls were implemented at SSFL are compared in the second paper, summarizing the significant reductions in regulatory exceedances after these interim activities and stormwater management have been implemented. 

2 Introduction and Site Description

The Santa Susana Field Laboratory occupies 1,153 ha (2,849 acres) in the Simi Hills of Ventura County, California, in the southern part of the state near Los Angeles. SSFL was previously used as a rocket engine test and nuclear research facility. The site is jointly owned by the Boeing Company and the federal government. The National Aeronautics and Space Administration administers the portion of the property owned by the federal government. The industrial activities at SSFL have ceased, and current activities include environmental monitoring and sampling, demolition, remediation, and ongoing remedial planning, and associated activities. Undeveloped land and open space provide wildlife habitat and natural areas.

SSFL is currently the focus of comprehensive environmental investigations and clean-up program development, conducted by Boeing, DOE, and NASA, and is overseen by the CalEPA/DTSC. DTSC is the lead regulatory agency overseeing the investigation and clean-up of contaminated soil and groundwater at SSFL. Final site soil clean-up will begin when the DTSC completes their site studies and sets the contaminated soil clean-up goals. Public interest and involvement with the regulatory process at SSFL are very high.

Planning for the contaminated soil clean-up at SSFL is an extremely complex process that has taken many years requiring extensive soil monitoring and evaluations while working with the site owners and the concerned public before the final clean-up can occur. This is not unusual for many contaminated site clean-up operations. During this long period, it is critical that the discharge of contaminants from the site by stormwater be controlled. This paper illustrates how the NPDES (National Pollutant Discharge Elimination System) stormwater permits at SSFL, regulated by the LARWQCB, along with other interim site controls regulated by CalEPA/DTSC, have been used to minimize the discharge of contaminated soil from the site until the final clean-up operations can start. The stormwater permits will also be in place after the final clean-up during a period of stormwater confirmation monitoring. This paper illustrates how site discharges have been controlled at SSFL using many different and complementary processes and shows how different efforts were used during this lengthy process. The authors are also confident that most of these complimentary processes can be effectively used at other industrial sites.

Stormwater discharges from SSFL are currently regulated by the LARWQCB under National Pollutant Discharge Elimination System Individual Permit No. CA0001309, issued in 2023 (LARWQCB 2024c). Several earlier discharge permits have also been in place to regulate SSFL stormwater discharges for over 25 years. The permit requires the Surface Water Expert Panel to provide input on annual reports that describe the previous year’s monitoring results, evaluate existing stormwater control performance, and review workplans that include recommendations for modified and/or new stormwater controls and monitoring that address any numeric exceedances from the regulated outfalls (Santa Susana Surface Water Expert Panel and Geosyntec 2015a is an early example).

Table 1 lists some examples of constituents with permit limits that were monitored at the SSFL stormwater outfalls before stormwater controls were in place (before about 2011). The 2023 stormwater discharge permit limits are also shown, along with the range of exceedances comparing these earlier monitoring results with the permit conditions. As noted, Part 2 of this paper series shows how these exceedances have been significantly reduced with the interim contaminated soil and material removal, and stormwater management activities. There are many additional constituents being monitored that do not have permit limits. This table indicates the key constituents of concern that were targeted for the site stormwater controls while the regulatory agencies determine the soil clean-up goals. The regulatory agencies responsible for setting the contaminated soil clean-up goals have conducted comprehensive soil monitoring over the site and are identifying the soil constituents that will drive the clean-up operations.

Table 1 Example stormwater constituents with 2023 permit limits at SSFL and early exceedance rates prior to site stormwater controls (LARWQCB 2024c).

Constituent 2023 permit limit* Rate of exceedances
compared to 2023 permit
Aluminum** 1.0 mg/L high (35 - 55%)
Iron** 0.3 mg/L prior PL
(Fe removed in 2023 permit)
high (35 - 55%)
Manganese** 50 µg/L high (35 - 55%)
Dioxin (TCDD TEQ (no DNQ))***       2.8×10-08 μg/L moderate (10 - 23%)
Lead 5.2 ug/L moderate (10 - 23%)
Mercury**** 0.1/0.024 µg/L moderate (10 - 23%)
Antimony 6.0 µg/L low (0.5 - 5%)
Arsenic 10.0 µg/L low (0.5 - 5%)
Copper 31/67.5 µg/L low (0.5 - 5%)
Nickel 86/94/100 µg/L low (0.5 - 5%)
Thallium 2.0 µg/L low (0.5 - 5%)
1.2-Dichloroethane 0.5 µg/L rare (<0.1%)
Barium 1.0 mg/L rare (<0.1%)
Beryllium 4.0 µg/L rare (<0.1%)
bis(2-ethylhexyl) Phthalate 4.0 µg/L rare (<0.1%)
Boron 1.0 mg/L rare (<0.1%)
Cadmium 3.1/4.0 µg/L rare (<0.1%)
Chromium VI 16 µg/L rare (<0.1%)
Combined Radium-226 and Radium-228 5 pCi/L***** rare (<0.1%)
Cyanide 8.5/9.5 µg/L rare (<0.1%)
Fluoride 1.6 mg/L rare (<0.1%)
Pentachlorophenol 1.0/16.5 µg/L rare (<0.1%)
Perchlorate 6.0 µg/L rare (<0.1%)
Selenium 5/8.2 µg/L rare (<0.1%)
Silver 4.1 µg/L rare (<0.1%)
Strontium-90 8.0 pCi/L rare (<0.1%)
Trichloroethene 5.0 µg/L rare (<0.1%)
Tritium 20,000 pCi/L rare (<0.1%)
Uranium 20 pCi/L rare (<0.1%)
Zinc 120/159 µg/L rare (<0.1%)

NOTES:
* Some constituents show more than one numeric limit as these vary for different SSFL outfalls based on different receiving water beneficial uses.
** natural background constituents
*** TCDD TEQ (no DNQ): dioxin toxicity equivalence, excluding congeners detected but not quantified, and including bioaccumulation equivalence adjustments.
**** some of the early Hg samples had detection limits greater than the 2023 permit limit of 0.024 µg/L, but not greater than the permit limit at the time of the earlier sampling.
***** pCi is the abbreviation for picocurie, a unit of radioactivity decay per second equal to one trillionth (10⁻¹²) of a curie, and pCi/L indicates the number of radioactive decays per second occurring in one liter of the sample.

The three constituents with the highest level of exceedances (aluminum, iron, and manganese) are naturally occurring major soil constituents and had no known relationships with historic site industrial activities but still have, or recently had, numeric effluent limits (NELs) in the permit. Iron was removed from the 2023 permit, so the 2015 permit limit for iron is shown on the table for reference. The constituents with moderate levels of stormwater permit exceedances (dioxins, lead, and mercury) were mostly associated with site activities and are therefore the primary targets for stormwater control efforts. The constituents with low and rare frequencies of exceedances are not specifically targeted for control but are reduced by the site stormwater controls due to their relationships with particulate solids which are effectively removed with the stormwater and erosion controls. Even though no early exceedances were noted for the radionuclide constituents in the stormwater, they were included in the development of the special treatment media used at most of the site stormwater controls due to their great interest by all involved with SSFL.

Sub-area stormwater monitoring was conducted to identify critical subwatershed drainage areas that had constituents of concern greater than the outfall permitted limits. Although the permit limits were not applicable at these locations, these data were used to rank the significance of the sub-areas. Stormwater controls were then used at critical locations. Several monitoring locations were selected that had no upgradient industrial activities (e.g., energy research and rocket testing, plus supporting activities) as on-site background locations. Some constituents of concern were identified at these background locations that exceeded the permit limits. Off-site background stormwater monitoring has also been conducted to verify the constituents that are naturally occurring in the area, or not unique to SSFL site industrial activities.

Additional special studies were also conducted over several years to identify sources of the problem stormwater constituents. Many potential sources at SSFL, such as atmospheric deposition, pavement solids, treated wood and adjacent soils, hydromulch, and wildfire ash, were monitored and evaluated, including comparisons with the extensive on-site soils database representing soils from former operational and contaminated areas and natural background soils. As examples, that information identified iron, manganese, and aluminum as background contaminants originating from natural soils present throughout the region, and that elevated dioxin was identified as being associated with site contaminated soil, although pavement and treated wood sources are also likely sources of elevated dioxin in the stormwater.

This paper describes the SSFL location and the industrial activities that have caused site contamination, and the interim material and soil clean-up activities that have been approved by the agencies (DTSC and LARWQCB) to protect stormwater runoff quality discharged from the site.

2.1 Methodology

This paper was prepared by gathering information from many sources to compile the history of the interim SSFL site activities conducted to reduce stormwater discharges and to protect downstream residents and the environment, while the regulatory agencies develop a final clean-up plan. This information is scattered throughout the internet at many websites, some previously noted above in the Objective section. The methodology for preparing this paper and collecting this information was as follows:

  1. Conducted internet searches pertaining to SSFL at regulatory agency (CalEPA/DTSC, USEPA, LARWQCB), site owner/operator (Boeing, DOE, NASA), public interest groups, and other websites.
  2. Reviewed presentations and public responses from the stormwater permit renewal public meetings.
  3. Reviewed presentations and public responses at annual public meetings presented by the Surface Water Expert Panel.
  4. Reviewed technical reports, annual reports, and stormwater quality databases.

Several thousand reports and articles were identified from these searches pertaining to SSFL stormwater issues. These were narrowed down to the most comprehensive summary reports and articles which comprise most of the cited references in this paper. The information was sorted and organized addressing the site activities having potential stormwater quality effects, by SSFL location and time since the site was identified for clean-up by the regulatory agencies.

A massive amount of stormwater quality data has been collected under the direction of the LARWQCB stormwater permits. These permits require stormwater samples from each of the regulated outfalls for every runoff producing rain event. About 43,000 concentration values for constituents with permit numeric effluent limits (NELs) were recorded over 25 years at the 12 outfalls. In addition to the constituents having NELs, many others are also routinely monitored as required by the discharge permit, including more than 250 constituents that are analyzed at every outfall at least once annually. In total, more than 70,000 analytical results for all constituents have been obtained from the outfalls by the time this paper was prepared. Complete data and sampling descriptions are contained in the monitoring reports submitted to the LARWQCB (Haley & Aldrich 2021 and Boeing 2024f, for example). These data were divided into two time periods (before and after the implementation of the interim site contaminated soil and material removal activities and stormwater quality controls) for statistical analyses and presented in Part 2 of this paper series. These two papers were divided due to the large amount of information, with this Part 1 paper describing the site activities and the Part 2 paper describing the data and statistical analyses. As shown in Part 2, there were many statistically significant improvements in stormwater quality from SSFL outfalls after the initiation of the interim site controls and the use of the stormwater treatment operations.

2.2 History of site activities and contamination at SSFL

The following descriptions of the site activities are mostly from the NASA, DOE, CalEPA/DTSC, LARWQCB, and Boeing publicly accessible websites, as cited in the text and listed in the reference list. Multiple regional, state, and federal agencies are involved in the clean-up program underway at SSFL (DTSC 2024a). These investigations and clean-up activities have included soils studies and clean-up, groundwater clean-up and monitoring, hazardous materials and waste handling, air quality testing, and radiation clean-up programs.

Figure 1 is a map of SSFL showing the outfall locations along with the administrative Areas I through IV, plus the undeveloped buffer areas. Some of the constituents of concern are related to specific locations and operations on the site, but many are spread out at many locations. Areas of contamination with significant stormwater contamination potential have undergone interim clean-up activities. Area IV contained most of the energy research activities (but radionuclides have been found elsewhere), perchlorates were present in the OF 008 watershed, lead and PAHs in the OF 009 shooting range, mercury near spill sites in the OF 004 watershed, and radionuclides and many chemical contaminants in the Area I Burn Pit, have all had interim clean-up activities, for example. DTSC soil sampling at SSFL has identified several constituents of concern in soils associated with the wide range of industrial activities at the site, as noted below (also listed are the stormwater outfalls containing watersheds in these areas):

  • Area I consists of 272 ha (671 acres) owned by Boeing, plus 17 ha (42 acres) in the northeast portion of the site administered by NASA. Area I contained administrative and laboratory facilities and was formerly used for rocket engine and component testing. Area I also included the former Area I Thermal Treatment Facility and three rocket engine test areas: the Bowl, Canyon, and Advanced Propulsion Test Facility areas. All test stands and administrative and laboratory facilities in Area I have been removed. Lead, polycyclic aromatic hydrocarbons (PAHs), perchlorates, radionuclides, polychlorinated biphenyls (PCBs), dioxins, pentachlorophenol (PCP), volatile organic compounds (VOCs), and metals are known soil contaminants in this area. Outfalls 008, 009, 011, and 001 receive runoff from this area.
  • Area II consists of 166 ha (410 acres) in the north-central portion of the site and is owned by the United States Government and is administered by NASA. Area II contained administrative and laboratory facilities, and four rocket test firing facilities: Alfa, Bravo, Coca, and Delta. NASA has removed the administrative and laboratory facilities and the Delta test area. The Bravo and Coca test areas are scheduled to be removed soon. Dioxins and total petroleum hydrocarbons (TPH) are known soil contaminants in this area. Outfalls 009 and 010 receive runoff from Area II.
  • Area III consists of 46 ha (114 acres) in the northwest portion of the site and is owned and operated by Boeing. Area III included the Systems Test Area (STL-IV) and associated laboratories. All Boeing facilities in Area III have now been removed. PCBs, PAHs, total petroleum hydrocarbons (TPH), dioxins, antimony, cadmium, chromium VI, mercury, selenium, silver, cesium-137, and strontium-90 are known soil contaminants in this area. Outfalls 018 and 002 receive runoff from Area III.
  • Area IV consists of 117 ha (290 acres) owned and operated by Boeing and 36 ha (90 acres) leased by DOE. DOE sponsored nuclear and non-nuclear energy research and development projects at the site. Nuclear energy research and handling of nuclear materials in Area IV ended in 1988. All DOE buildings in Area IV have been removed. There are five buildings that were operated by Boeing that remain within Area IV that will be removed. PCBs, PAHs, TPH, dioxins, antimony, cadmium, chromium VI, mercury, selenium, silver, cesium-137, and strontium-90 are known soil contaminants in this area. Outfalls 003, 004, 005, 006, 007, and 018 receive runoff from this area.
  • The northern and southern buffer areas consist of 71 and 461 ha (175 and 1,140 acres), respectively. Industrial activities have never occurred in these naturally vegetated areas.

Figure 1 Stormwater outfall locations and administrative units at SSFL
(Surface Water Expert Panel and Geosyntec 2023).

Chemicals in SSFL soils and groundwater came from historical testing and maintenance activities. The primary chemical contaminants included a variety of solvents (primarily trichloroethylene), metals, and petroleum hydrocarbons. Radioactive contamination resulted from energy research operations and disposal of explosive ignitors. Solvents containing volatile organic compounds were used until the 1990s to clean rocket engine test equipment (Boeing 2024a). These solvents were often disposed of onsite and seeped into soil, bedrock, and groundwater. The standard practice at the time of the site operation was to capture the wastewater, cooling water, and solvents at the test stands during the rocket engine tests in basins (DTSC 2024d). During rocket engine tests at SSFL, solvents such as trichloroethylene (TCE) were used as cleaning solvents. TCE was flushed from engine components into concrete channels and discharged to the Coca Skim Pond, for example. The Coca Skim Pond was located within the Coca Test Area and had a capacity of 1.1 million L (300,000 gallons). It was first used in 1953 and operated as a catchment basin and emergency spill containment area for the test area until 1962. A concrete skirt encircled the pond, but the bottom was unlined. Figure 2 shows the fluid collection system at the Coca test stand. Starting in 1961, the TCE capture and recovery systems were improved. The Groundwater Expert Panel has reviewed the site TCE groundwater contamination issues and its remediation. Although found in the groundwater, TCE has rarely been found in the site surface water.

Figure 2 Coca rocket test stand showing spillways to ponds (DTSC 2024d).

Other hazardous wastes at SSFL were disposed on-site in unlined burn pits where the material was incinerated, a standard practice during the time of the site operation. Several of these disposal areas have been subject to interim clean-up operations, as described in this paper.

Much of the work conducted on behalf of the U.S. Department of Energy at the Energy Technology Engineering Center involved metallic sodium nuclear power systems. The Sodium Reactor Experiment (SRE) suffered an accident in 1959 when overheating caused fuel damage in the reactor’s core. During the accident, primary power and cooling were maintained, coolant continued to circulate throughout the reactor core, and the reactor vessel remained intact, preventing a meltdown, but with the release of some radioactive contaminants. Following the accident, the SRE was repaired, and operations continued until the end of the project in 1964. Nuclear research-related programs and operations at SSFL ended in 1988 (DOE 2024a). Beginning in the 1990s, activities in Area IV focused on decontamination and decommissioning of former nuclear facilities (DOE 2024). In 1996, Rocketdyne and its assets, including SSFL, merged into The Boeing Company in a corporate acquisition of the aerospace divisions of Rockwell International. In 2006, Rocketdyne was sold to Pratt-Whitney. The Boeing Company retained ownership and operations of SSFL.

There are many sources of information and discussions of the 1959 SRE accident. This topic is complex and has been subject to many studies, public concerns, and interim clean-up efforts. DOE (2024a) includes several summary descriptions of the accident and calculated radioactive material releases, including reports and news releases from 1959 through 1962. This DOE website also includes independent study reports describing the contaminant releases from the accident. There are also links to the SRE public workshop materials, and to an extensive library of information describing the design, operations, causes of the accident, activities taken to recover and restart the reactor, and decommissioning of the reactor facility. The DTSC (2024c) “frequently asked questions” website also addresses many questions from the public concerning the risks and final clean-up of this contaminated area. DTSC (2024e) includes a summary of cancer studies and exposure assessments related to SSFL. Wikipedia (2024) is another source of information on the SRE accident and includes discussions of the controversy concerning conflicting information. The SRE site and surrounding facilities have undergone several interim contaminated material removal operations, while the DTSC is currently studying final clean-up options for the whole site. The site responsible parties have committed to remove all radionuclide contaminated soils to natural background levels at SSFL. The stormwater permits have always included a range of radionuclide constituents for monitoring at SSFL from all outfalls for every runoff producing rain. Few of these have been detected in the stormwater at levels greater than the drinking water-based permit limits over the years. The development of the stormwater treatment media, previously described by Pitt and Clark (2010) and Pitt et al. (2021; 2022), considered the possible presence of these materials and selected media components that would be effective in their removal from stormwater, along with the many other potential site stormwater contaminants. When replacement of the media in the stormwater controls is required, it is characterized and evaluated for disposal at proper facilities.

The following maps show the preliminary areas of soil contamination on the SSFL site due to historical industrial activities. Final areas of soil remediation and the clean-up requirements are still being developed as part of the Environmental Impact process, regulatory agency studies, and public involvement. When that information is finalized, the several years contaminated soil removal process can proceed. Recent draft environmental impact statement (EIS) reports and evaluations map the SSFL soil contamination areas.

Figure 3 shows the map for Area IV, which included the DOE facilities and support buildings. In this area, remediation is needed to clean up residual chemicals and radionuclides from historical DOE operations at the Energy Technology Engineering Center (ETEC). Area IV is the area of most interest at SSFL as it included a broad range of site activities, including nuclear energy research, and accidents. Figure 3 shows the extent of the chemical and radioactive constituents above the AOC LUT (Administrative Orders on Consent Look-up Tables) remediation goal described in the draft Environmental Impact Statement (EIS) for Area IV and the northern buffer zone (NBZ) in areas under the responsibility of DOE (DOE 2024b). More than 11,000 soil samples were evaluated in this area, and an estimated 1.1 million cubic meters (1.4 million cubic yards) of soil were found not to meet the AOC LUT values in this area of SSFL. The draft EIS reported that the most frequently observed chemical constituents included PCBs, PAHs, TPH, dioxins, and metals (antimony, cadmium, chromium VI, mercury, selenium, and silver). They also reported that the most frequently observed radionuclide constituents included cesium-137 and strontium-90. The estimated soil removal volume at SSFL is adjusted to account for exemptions to protect biological and cultural resources and proposed on-site soil remediation of soils having low levels of TPH and PAHs, as described in the draft EIS.

Figure 3 Preliminary soil remediation areas for clean-up based on radiological (blue) and chemical (purple) goals in DOE areas of responsibility in Area IV and the northern buffer zone (DOE 2024b).

The NASA areas of responsibility at SSFL and soil remediation areas are shown in Figure 4, from their draft Soil Data Summary Report (DSR) to DTSC (NASA 2024e). NASA and DTSC soil scientists found that the soil sampling was not effective in evaluating the extent of dioxins/furans and TPH soil levels because the AOC LUT values were often lower than the naturally occurring values at the site. This resulted in exceedances in areas with no potential for contamination from site industrial activities. NASA therefore estimated the extent of contamination using topographic features of the site shown as the “Extended Remedial Area (XRA)” on Figure 4.

Figure 4 Remediation areas on NASA areas of responsibility at SSFL (NASA 2024e).

Figure 5 shows the RCRA (Resource Conservation and Recovery Act) Facility Investigation (RFI) areas (enclosed by the black dashed lines) on the Boeing areas of responsibility at SSFL (Jacobs 2023). These areas of former site operations were identified to meet the requirements of the DTSC’s conditional approval to address soil clean-up in the Boeing areas of responsibility under the 2007 consent order.

Figure 5 RFI operational areas on Boeing administrative areas on SSFL (Jacobs 2023).

Table 2 summarizes stormwater constituents that had at least one observation greater than the 2015 permit discharge limits at the regulated outfalls (the 2023 limits were not available when these comparisons were made). These are all from the early monitoring period prior to 2011 and before most of the interim material removal activities and the stormwater controls were implemented at the site. Part 2 of this paper series presents these data with statistical analyses showing the significant reductions in the exceedance observations at the outfalls after the use of the on-site controls and interim removal of contaminated soils and materials.

Table 2 Constituents that had at least one observation greater than the 2015 NELs at SSFL outfalls before interim contaminated material removal and stormwater management.

  Northern outfalls* OF008 OF009 OF011 OF001** OF018 OF002**
1,2-Dichloroethane           X  
Antimony X            
Arsenic             X
Barium             X
Beryllium             X
Biochemical Oxygen Demand (BOD)             X
bis (2-ethylhexyl) Phthalate             X
Cadmium X   X       X
Chloride X            
Combined Radium-226 and Radium-228             X
Copper X X X   X   X
Cyanide X   X       X
Iron       X X X X
Lead X X X X   X X
Manganese       X X X X
Mercury X X X X X X X
Nitrate + Nitrite as Nitrogen (N) X           X
n-Nitroso-dimethylamine             X
Oil & Grease X   X     X  
Pentachlorophenol             X
pH (field)     X        
Selenium   X          
Strontium-90 X            
Sulfate             X
TCDD TEQ No DNQ X X X X X X X
Thallium X   X        
Total Dissolved Solids X            
Total Residual Chlorine       X X    

NOTE:
*Outfalls 3, 4, 5, 6, 7, and 10
**these are benchmarks in the 2015 permit as most of their flows originate from upstream regulated outfalls

Complex and steep site topography prohibits safe access to the actual site boundaries, so the regulated stormwater outfall monitoring locations are placed as close to the site property boundaries to capture as much of the site runoff from the previous industrial areas as possible. The stormwater permit requires extensive monitoring for every runoff producing rain event from all outfalls, including constituents associated with the prior industrial activity on the site and soil contaminants. The permit limits are determined by the regulatory agency based on such objectives as receiving water TMDL targets, human health, and aquatic life considerations.

Site clean-up and environmental regulations

The California Department of Toxic Substances Control (DTSC) is a department within California’s Environmental Protection Agency. DTSC regulates the handling and clean-up of hazardous wastes in California (DTSC 2024a). At SSFL, DTSC directs and oversees the site investigations and clean-up activities being conducted by Boeing, NASA, and DOE. SSFL clean-up begins upon completion of the required environmental review process, and when DTSC makes the required findings, a public process is conducted, and a remedy decision is made. As of October 2026, field sampling is now complete. The investigation reports for soil and groundwater are in the review and approval process with DTSC project staff. Workplans and reports for evaluating potential clean-up technologies are being reviewed simultaneously. In September 2017, DTSC issued the draft Program Environmental Impact Report (PEIR) to evaluate impacts to the environment from SSFL clean-up activities and identified measures to address those impacts. DTSC prepared responses to the comments on the draft report and is preparing the final PEIR.

According to the DTSC (DTSC 2024a), SSFL is an ongoing clean-up project that will take years to complete. The site will continue to be monitored to ensure the safety of the community and the environment. While final clean-up has not yet begun, many interim actions have already been completed, including:

  • Critical soil clean-ups have been completed,
  • A groundwater pump and treat system that removes contamination and stops groundwater migration is on-going,
  • Stormwater treatment systems that help prevent off-site releases of contaminated stormwater, and
  • The surface water discharge permit requires the continued use of distributed source area stormwater controls to reduce discharges of contaminated runoff. The permit also requires outfall compliance monitoring at all stormwater outfalls for every runoff producing event.

There are many challenges to implementing stormwater quality controls at SSFL, such as:

  • Steep topography, shallow bedrock (outcrops of Chatsworth Formation sandstone are ubiquitous, as readily apparent in aerial photographs),
  • Susceptibility to wildfires and the associated impacts of increased runoff and deteriorated water quality,
  • Susceptibility to extended drought which makes the establishment of vegetation to stabilize soils very challenging, 
  • Occasional years of very high precipitation, such as occurred during 2022–23, which produce very large runoff volumes that cannot all be treated to the desired level, and
  • Residential development is widespread immediately downhill from SSFL and the public can interact with the intermittent stormflows discharged from the site (see discussion of the stormwater Human Health Risk Assessment in this paper that was conducted to evaluate the risks associated with the interaction of the public with site stormwater runoff). 

Addressing these issues has been challenging. Two wildfires have affected SSFL in the last 20 years; the Topanga wildfire in 2005 that affected the whole site, and the Woolsey wildfire in 2018 that affected about 80% of the site. During the 2019 Surface Water Expert Panel public meeting (2019), the following stormwater management actions after the Woolsey fire were described:

  • Hydromulch and fiber rolls were extensively installed in burned areas very rapidly after the burn occurred,
  • Burned HDPE pipelines which direct runoff to the advanced stormwater treatment systems were replaced quickly,
  • Debris was removed and ash vacuumed from burned areas, and
  • Repair and maintenance of stormwater distributed controls, the advanced stormwater treatment systems, and the sampling stations.

During the wildfire, there was substantial damage to some of the stormwater controls and monitoring locations, including destroyed aluminum structures that partially melted and had to be replaced. Most of the stormwater management repairs were completed prior to the first runoff producing storm that occurred four weeks after the wildfire. Recommendations were also made and implemented to reduce the time needed to repair the stormwater management systems and to shorten the time for their operation in the future, including the stockpiling of erosion controls for emergency response and adding a generator at the ELV treatment system which was susceptible to power outages.

Adding to these technical challenges is the nature of the NPDES permit that governs stormwater discharges from SSFL and requires that very stringent numeric effluent limits be met for multiple constituents at all the outfalls for all rainfall events that produce runoff. The following sections of this paper address these topics, while the following paper (Pitt et al. 2026) presents the resulting changes in the discharged stormwater quality that have occurred over the years in response to these interim contaminated material and soil removal and stormwater management activities.

3 Interim contaminated material removal and stormwater treatment at SSFL

This section describes SSFL site activities that have involved interim, agency-directed removal of contaminated materials and soil in critical areas as the final DTSC clean-up plans are being developed. This section also describes the stormwater treatment activities on SSFL. Table 3 lists, in chronological order, the interim contaminated soil and material removals, stormwater treatment installations, along with two wildfires that affected the site, during the site stormwater monitoring efforts, based on the many project reports and presentations cited in this paper. The dates for these activities are shown along with the locations affected (by NPDES outfall number for the affected watersheds). These activities are further described in the following sections of this paper.

Table 3 Interim contaminated material removal and stormwater treatment activities at SSFL, by date.

Activity Type of activity    Start/end dates Locations
Sodium Disposal Facility (sodium burn pit) soil removal contaminated material removal 2000 Outfalls 005, 006, and 007
Interim soil removal and perchlorate treatment contaminated material removal 2003–2004 Building 359 Happy Valley Area I, Outfalls 008 and 011
Topanga fire wildfire on site October 2005 all
Northern Drainage debris removal contaminated material removal 2007–2009 Liquid Oxygen (LOX) Plant and shooting range, Outfall 009
Distributed stormwater controls stormwater treatment systems 2009–2019 installed, ongoing Outfalls 008 and 009
Interim source removal actions (ISRA) at Outfall 008 contaminated material removal 2010 Outfall 008
Advanced stormwater treatment system at Outfall 018 in operation stormwater treatment systems 2011, ongoing Outfalls 003, 004, 005, 006, 007, 010, 009 helipad paved area of 009, 018
Interim source removal actions (ISRA) at Outfall 009 contaminated material removal 2013 Outfall 009
NASA demolition and contaminated material removal - structures removal contaminated material removal Phase 1,
2015–2016
Expendable Launch Vehicle (ELV) service area of northern portion of Area II, Outfalls 018, 001, and 009
Boeing building demolition and asphalt removal contaminated material removal 2015–2016 Area IV, Outfalls 005, 006, 007, 003, 004, and 018
NASA demolition and contaminated material removal - structures removal contaminated material removal Phase 2,
2017–2018
Skyline Tanks and Pipelines, the Alfa/Bravo and Coca/Delta Fuel Farms, the Sewage Treatment Plant, LOX Plant, and the former Delta Test Area, Outfalls 018 and 009
Woolsey fire wildfire on site November 2018 Outfalls 001, 011, 002, 018, and 008
Treated wood pole barriers stormwater treatment systems 2019 (Area II) and 2020 (southern buffer zone), ongoing Area II and southern buffer zone, Outfalls 018, 001, 009, and 002
NASA demolition and contaminated material removal ––structures removal contaminated material removal Phase 3,
2019–2020
Alfa, Bravo, and Coca Test Areas, Outfall 018
NASA demolition and contaminated material removal – structures removal contaminated material removal Phase 4,
2021–2022
LOX area in NASA Area I and the Bravo Test Stand 3 area in NASA Area II, Outfalls 018, 001, and 009
Advanced stormwater treatment system at Outfall 011 in operation stormwater treatment systems 2021, ongoing Outfall 011
Utility pole removal contaminated material removal 2022 Outfalls 011, 009, and 018
NASA demolition and contaminated material removal – structures removal contaminated material removal Phase 5, 2023 Bravo Test Stands and control houses in NASA Area II, Outfalls 018, 001, and 009
Imminent and Substantial Endangerment (ISE) Clean-up Former Shooting Range contaminated material removal 2023–2025 Outfalls 009
Imminent and Substantial Endangerment (ISE) Clean-up Area I Burn Pit contaminated material removal   2024–2026 Outfalls 001 and 011

The measure of success for the activities listed in Table 3 has always been the reduction of contaminants of concern in the stormwater at the regulated outfalls, as reflected in decreases in stormwater permit violations. These are presented in the annual stormwater reports, and in various published papers.

The first item to control stormwater discharges from SSFL was to focus on source reduction of contaminated soil and materials as much as possible, while the regulatory agencies studied the site and prepared the final clean-up plan. These interim measures were allowed due to the potential of serious stormwater contamination potential.

Table 3 lists a number of contaminated material removal actions starting in 2000, focusing on the Sodium Disposal Facility and the perchlorate facility interim soil removal. These affected the watersheds draining to Outfalls 5, 6, 7, 8, and 9.

Two advanced stormwater treatment systems (Actiflo systems) were operational in 2011 and 2021 (treatment at Outfall 011 was later due to lack of flows during earlier years since its construction). These treat a broad range of site contaminants in stormwater originating from the watersheds draining to Outfalls 3 to 7, 10, 11, 18 and parts of 9.

Many areas of the Outfall 8 and 9 watersheds could not be treated using the advanced stormwater controls due to adverse site topography, so a distributed stormwater treatment process was initiated with evaluations and installations starting in 2009. The Surface Water Expert Panel was charged with locating and overseeing the design of these controls. Early work to develop a specialized treatment media for use in the distributed controls considering the broad range of site stormwater contaminants was completed in 2010 (Pitt and Clark 2010). Pitt et al. 2021 and 2022 discuss the development and performance of the media along with long-term performance of the distributed controls. Performance of the individual distributed controls has also been presented in the annual stormwater reports, and Part 2 of this paper series describes how the outfall stormwater monitoring has improved with the use of the site interim contaminated material removal and the combination of stormwater controls.

Additional contaminated material removal, listed on Table 3, has been on-going. The Imminent and Substantial Endangerment clean-up of the former shooting range and the Area I Burn Pit started in 2023 and will be completed in 2026. The interim contaminated soil removal was under specific direction of DTSC and was verified through soil sampling after removal of material to depths determined by the soil core analyses. If the laboratory showed soil concentrations greater than the goal after this soil was removed, additional soil was removed until the goal was reached, as verified by additional laboratory analyses. Final soil clean-up goals are being determined by DTSC. However, the site responsible parties have stated they will remove all soil contaminated by radionuclides down to background levels.

NASA (NASA 2024a) has completed its soil investigation to understand the nature and extent of soil contamination in NASA administered areas at SSFL. These activities included sampling, laboratory analyses, treatability studies, and pilot testing in preparation for conducting a comprehensive soil clean-up effort. An example of an early interim soil clean-up activity included removing 2,300 m3 (3,000 yd3) of mercury contaminated material including several buildings and five underground storage tanks.

In 1999, the DTSC directed Boeing to remove soils contaminated with dioxin, PCBs, solvents, and other wastes at the former Sodium Disposal Facility (sodium burn pit) (DTSC 2024b). The soil was a source of potential contamination of surrounding areas and groundwater in the bedrock. In 2000, over 11,000 m3 (14,000 yd3) of contaminated soil down to bedrock was removed. Following removal of the soil, the exposed bedrock surfaces were swept and vacuumed and mapped for fractures. DTSC geologists collected samples to confirm that soil and bedrock were removed to the required health-based clean-up levels prior to installation of a clay backfill cap. DTSC continues to monitor the cap’s effectiveness.

The Happy Valley site at SSFL, located in Area I (draining to Outfall 008), was used for solid propellant research and testing, along with gun propellant testing, starting in the 1950s and lasting until 1993. The primary use of perchlorate at the Happy Valley site occurred in the 1960s in support of research, development, and production of flares for the military, as well as for rocket propellant research and testing activities during the 1970s through 1993. Additional perchlorate use occurred in the northern portion of Happy Valley, where turbine spinners were tested in the 1950s. A 2003 DTSC Interim Measure included:

  1. Removal and restoration of soil, sediment, and bedrock containing perchlorate, and in some cases, metals; and
  2. Biotreatment of the excavated soil containing perchlorate at the Building 359 area.

Excavation of soil that contained metals and perchlorate was completed in October 2003, and re-contouring of soil, implementation of erosion control measures, and restoration of vegetation in the Happy Valley Drainage were completed in January 2004. The biotreatment of perchlorate in soil began in Fall 2004. Additional clean-up of contaminated soil and material in this area occurred during 2009 to 2013, as part of the Interim Source Removal Actions (ISRA), described later. Extensive native plant re-establishment occurred along with erosion controls applied over most of the drainage area, with special attention given to stabilizing dirt roads used to access groundwater monitoring wells. As shown in the Part 2 paper, stormwater monitoring at the 008 Outfall indicates very few exceedances after these interim activities. In addition, runoff from this watershed rarely occurs now, except late in the rainy season after long saturating rainfall events. This area now has stormwater characteristics similar to natural watersheds in the region.

Northern Drainage debris removal

The Northern Drainage, the main drainage channel above Outfall 009, also had interim clean-up activities at the liquid oxygen (LOX) plant debris area and the adjacent shooting range/clay target debris area, targeting PAHs from clay targets and lead from the shot, along with other debris (Boeing 2024b). About 1,900 m3 (2,500 yd3) of debris and soil were removed from an area of about 0.1 ha (0.3 acres) in the LOX debris area in 2007. The shooting range debris area removal activity in 2008 removed about 3,040 m3 (3,970 yd3) of sediment, soil, and debris. Additional clay target debris were also removed during 2009.

In addition to debris removal, sediment transport down the Northern Drainage channel is also of interest, particularly as related to contaminant transport. Fluvial morphologists from Geosyntec have evaluated the morphology and behaviour of the channel on many occasions, including recommendations for bank and bottom stabilization measures in some key locations. Check dams, scour protection downstream from culverts and bridges, and bank stabilization measures have been successfully implemented. These structures are monitored after large runoff events and are repaired as necessary.  

NASA demolition and contaminated material removal

NASA is conducting demolition activities in NASA-administered areas at SSFL as part of its clean-up agreements and to prepare the site for final clean-up (NASA 2024b). Demolition activities began in early 2015 and the first four phases were completed by 2022, and Phase five demolition activities began in the Spring of 2023.

  1. Phase One: The ELV (expendable launch vehicle) Service Area is located in the northern portion of Area II. Structures removed in this area included former engineering offices, maintenance buildings, and the ELV final assembly building. In addition to above ground structures, utility poles, piping, concrete, and roadways in this area were also removed.
  2. Phase Two: Removal activities focused on areas outside of the historic areas where obsolete buildings and infrastructure were still in place. This included Skyline Tanks and Pipelines, the Alfa/Bravo and Coca/Delta Fuel Farms, the sewage treatment plant, the Liquid Oxygen (LOX) Plant, and the former Delta Test Area.
  3. Phase Three: This phase focused on the removal of ancillary structures and buildings in the Alfa, Bravo, and Coca Test Areas. The six existing test stands, and control houses were not demolished during Phase Three. Demolition in these areas involved obsolete structures such as inactive storage tanks, asphalt parking areas, and dormant office buildings.
  4. Phase Four: Demolition included approximately 80 ha (200 acres), involving the LOX area in NASA Area I and the Bravo Test Stand 3 area in NASA Area II.

Phase Four demolition focused on the removal of a subsurface concrete slab that remained in Area I LOX, as well as the retaining wall, concrete foundation, and spillway of the former Bravo Test Stand 3, as shown on Figure 6.

Figure 6 Phase Four demolition. Photos from NASA website (NASA 2024b).

Phase Five: This phase covers approximately 80 ha (200 acres), including the Bravo Test Stands and control houses in NASA Area II. Phase Five demolition includes the removal of the two remaining test stands and control house in the Bravo Test Area and began in the Spring of 2023.

Building demolition and asphalt removal on Boeing property

One of the goals of the site stormwater management efforts before the final site clean-up is to reduce the number of runoff events and the amounts of stormwater discharged, as they both directly affect the stormwater permit compliance and discharge of contaminants off site. Removing paved areas not needed for the final clean-up process, buildings, and test stands, reduces runoff volumes at the discharge locations. Also, the non-soil pollutant source investigations identified paved areas as being important sources of dioxins and other contaminants. These activities, along with the other site stormwater and contaminated material removal actions, are shown in the Part 2 paper to have resulted in improved compliance with the stormwater permit limits. 

The following map and photos show the extent of the building demolition and asphalt removal that occurred on the Boeing property. Also shown in Figure 7 are pre- and post-demolition photographs at several of these locations.

Figure 7 Building and asphalt demolition on Boeing property (Boeing 2024h).

Demolition sub-area monitoring

Stormwater near areas of demolition was monitored by collecting stormwater samples to characterize the runoff before reaching the Silvernale pond and the advanced stormwater treatment system, per a 2020 Surface Water Expert Panel recommendation. Following the completion of demolition activities of the Sodium Pump Test Facility (SPTF), stormwater samples were collected and analyzed for metals, dioxins, radionuclides, and general water quality constituents. Concentrations in the stormwater samples collected at the SPTF demolition site were above Outfall 018 2015 permit limits in one or both samples for the following analytes: arsenic, cadmium, chromium VI, copper, lead, mercury, zinc, chronic toxicity, detergents (defined as methylene blue active substances, or MBAS), iron, manganese, and TCDD TEQ no DNQ (TCDD weighted using Toxicity Equivalence, excluding congeners that were not qualified). No radionuclides were detected greater than the Outfall 018 2015 Permit Limits in any of the SPTF sub-area samples. The runoff from this area is diverted to the Silvernale advanced stormwater treatment system for further treatment. No concentrations of these constituents greater than the Outfall 018 2015 permit limits have been observed in the treated effluent from the treatment system.

Non-industrial sources special study

Special studies were conducted to identify additional sources of contaminated materials for interim removal or treatment while waiting for final contaminated soil clean-up guidance and permission from DTSC. The Surface Water Expert Panel and Geosyntec developed the Special Monitoring Studies program for the 009 Watershed (“Special Study Work Plan”) (Santa Susana Surface Water Expert Panel and Geosyntec Consultants 2015b), in part to address periodic lead and dioxin exceedances despite the implementation of numerous distributed stormwater controls targeting former operational areas in the upper Outfall 009 watershed area. Earlier findings from the stormwater treatment sub-area monitoring at SSFL found that runoff from paved sub-areas had significantly higher concentrations of constituents of concern (COC) than from unpaved sub-areas, regardless of whether impacted soils were known to be present in the drainage areas. A technical paper describing the findings from this special-sources study is currently being prepared, and data summaries have been provided in the annual stormwater reports submitted to the LARWQCB (Santa Susana Surface Water Expert Panel and Geosyntec Consultants 2022).

Besides the importance of asphalt paved areas, treated wood utility poles and surrounding soil areas were also found to have elevated dioxin concentrations. Therefore, utility poles at SSFL close to pavement or drainage areas were identified for special controls at the pole bases. If poles were not in use (and belonging to Boeing or NASA), they were removed. Forty-two unused treated wood utility poles on Boeing property and 12 poles on NASA property were removed (mostly in the Outfall 009 and 011 watersheds), between April–June 2022, as shown in Figure 8.

Figure 8 Utility pole locations and materials (red high-lighted poles were removed) (Surface Water Expert Panel and Geosyntec 2022).

Regional Water Quality Control Board Interim Source Removal Actions (ISRA)

The Los Angeles Regional Water Quality Control Board issued a 13304 Order on December 3, 2008, to require “interim/source removal actions to remove wastes that are causing or contributing to violations of limitations contained in the NPDES permit”, Order No. R4-2004-0111, in the Outfalls 008 and 009 drainage areas (Boeing 2024c). Based on an evaluation of all stormwater samples collected at Outfalls 008 and 009 since August 2004, the following constituents of concern were identified for these outfalls: copper, lead, and dioxins at Outfall 008, and cadmium, copper, lead, mercury, and dioxins at Outfall 009.

ISRA activities were implemented in three phases between 2009 and 2013 and included the removal of approximately 19,622 m3 (25,664 yd3) from 36 ISRA areas. Restoration activities included backfilling the excavations using a local soil borrow source and/or gravel, re-contouring using adjacent soil, and/or installing erosion controls, including re-vegetation of the areas, as shown on Figure 9. Following the ISRA remedial activities, performance monitoring up- and downstream of completed ISRA areas was performed through two rainy seasons to ensure successful compliance with the restoration objectives.

Figure 9 ISRA excavations and regrading. Photos from Boeing (Boeing 2024d).

Imminent and Substantial Endangerment (ISE) clean-up areas

Emergency provisions of the California Environmental Quality Act (CalEQA 2024a) have allowed early clean-up of a former shooting range located adjacent to SSFL. Boeing cleaned up the soil contaminated by lead from shot and clay target fragments left behind in a shooting range overshot area operated by a former gun club (Rocketdyne-Atomics International Rifle and Pistol Club) on property now owned by the Santa Monica Mountains Conservancy and operated as Sage Ranch Park by the Mountains Recreation Conservancy Authority (MRCA) (CalEQA 2024a). The clean-up began in the spring of 2023 and was completed in 2025. This is a follow-up removal of contaminated material from this general area that occurred from 2007 to 2009, along the Northern Drainage, described previously. The purpose of this project was the removal of soil contaminated with the following hazardous substances: lead (the most frequently detected contaminant being addressed by this clean-up), PAHs, antimony, and arsenic in an approximately 13 ha (31 acres) area, as shown on Figure 10. About 11,500 cubic meters (15,000 cubic yards) of contaminated soil were removed from this area during this ISE clean-up.

Figure 10 Former shooting range area soil showing lead contamination (Outfall 009 watershed) (Surface Water Expert Panel and Geosyntec 2023).

The DTSC concluded that hazardous substances at the site posed a risk to human health and ecological receptors, and the DTSC and Boeing agreed that removal actions were necessary to mitigate the potential release of these substances from the site. Boeing’s removal actions brought site soil lead levels below the high toxicity reference ecological risk-based screening level for lead, which is significantly more protective than the human health criterion. The removal actions also allow MRCA to reopen closed portions of popular Sage Ranch Park trails to recreational users following DTSC review and approval of the clean-up.

The DTSC also issued a notice of exception concerning an ISE Determination and Consent Order for the Area I Burn Pit (CalEQA 2024b). The purpose of this project was the removal of soil contaminated with hazardous substances, including cadmium, mercury, molybdenum, nickel, zinc, PCBs (Aroclor-1248 and Aroclor-1254), dioxins, pentachlorophenol, and trichloroethylene (TCE) in an approximately 2.3 ha (5.8 acres) site, as shown on Figure 11. The Area I Burn Pit formerly consisted of two burn pits, three earthen ponds, three concrete-lined ponds, including an acid pit, a former Fire Department Demonstration Area, an entrance shack and related storage area, a control center, and two explosive storage sheds. The Area I Burn Pit also contains levels of radionuclides above the January 30, 2013, Draft Provisional Radiological Lookup Table Values (LUTVs). The site previously used a geotextile fabric cover to mitigate off-site migration of these contaminants. However, this cover was temporary, and the combination of time and severe weather was determined by DTSC to likely cause contaminated runoff and migration of hazardous substances. This project began in the spring of 2024 and is on track to be completed in 2026 and will involve the removal of about 7,600 cubic meters (10,000 cubic yards) of contaminated soil.

Figure 11 Area I Burn Pit contaminated soil area (Outfall 011 and 001 watersheds) (Jacobs 2023).

3.1 Public involvement

Annual stormwater expert panel public meeting notices are sent to everyone on the mailing list and other interested parties in the community, including journalists and local politicians. The notice also includes a questionnaire to rank suggested topics to cover during the public meeting and where to visit during the site tour. Questions during the meetings and tours are answered and summarized on various frequently asked questions websites, including DTSC (2024f), NASA (2024c; 2024f), Golden State Water Company (2024), and Boeing (2024j). In addition, videos of presentations and site tours are located at the Surface Water Expert Panel report website (Surface Water Expert Panel 2023; Boeing 2024k).

The Surface Water Expert Panel has conducted approximately yearly public meetings and site tours since 2011, as shown on Table 4. Topics at the meetings typically include progress updates on site conditions and stormwater quality. The meetings also provide opportunities for feedback from the public. Project status reports and submitted documents are also posted on the Boeing project website following completion of major project milestones and in advance of public outreach meetings. Progress reports are also submitted to and posted by DTSC and the LARWQCB.

Table 4 Surface Water Expert Panel public involvement activities, 2011–2023 (Presentations and handouts located online at Boeing 2024i).

Date Activity
November 29, 2023 Public meeting and SSFL tour
November 17, 2022 Public meeting and SSFL tour
August 19, 2021 Public meeting (virtual)
August 11, 2020 Public meeting (virtual)
July 17 2019 Public meeting and SSFL tour
May 9, 2019 Presentation to LARWQCB
May 25, 2018 Public meeting and SSFL tour
August 17, 2017 DIPCON LA Conference SSFL tour
March 21, 2017 Public meeting and SSFL tour
November 19, 2014 Community Action Group meeting
March 20, 2013 Public meeting and SSFL tour
October 6, 2013 Public meeting and SSFL tour
August 25, 2011 Public meeting
January 22, 2011 Public meeting and SSFL tour

Many of the public questions during these meetings and tours relate to soil contamination and final clean-up, which are under the jurisdiction of the DTSC. The DTSC SSFL website has much information pertaining to these questions, including the FAQ website noted above. Other frequently asked questions relate to groundwater contamination, which are addressed by the activities of the Groundwater Expert Panel. They have published many technical reports and papers and have conducted site tours specifically to address groundwater issues. Groundwater contamination of public water supplies by SSFL is also a concern and the Golden State Water Company (2024) FAQ website, noted above, addresses these questions. Topics that the public has raised in meetings with the Panel focusing on stormwater have included:

  • The relationship between health problems for residents who live downslope and in the vicinity of the site who may be exposed to contaminated site runoff;
  • Continued NPDES permit exceedances despite the numerous facilities that have been implemented at the recommendation of the Panel to improve stormwater runoff quality;
  • The presence of seeps that are thought by some to be contaminated are located short distances downstream from Outfalls 001 and 002, and are therefore not being monitored at those locations; and
  • Concerns that the stormwater storage ponds infiltrate water and therefore contaminate the groundwater.

A major role of the public concerning stormwater has been during the public meetings conducted by the Los Angeles Regional Water Quality Control Board during the stormwater permit updates. Many of their concerns have been reflected in changes to the discharge permits, including the numeric effluent limits.

The public have also questioned flows observed off site below Outfall 002 during periods of no rain when no flows were recorded at the outfall. The sources of these flows have been investigated and were identified as coming from uncontaminated (except for the presence of naturally occurring sulfate) groundwater seeps, which have been routinely monitored as part of the SSFL groundwater studies. Further studies downstream from this area also identified excess landscape watering and possible septic tank leakage from homes adjacent to the creek as sources of the flows. Findings of these investigations were also made during later public meetings.

More recently, questions about flows below Outfall 004 during periods of no rain have also been asked. This area was investigated, and the flows were found to be associated with a small pool below the outfall which collected water from an adjacent hillside. Later public meetings have reported on these investigations.

3.2 Stormwater human health risk assessment

In 2017, Geosyntec and the Expert Panel prepared the “Human Health Risk Assessment” (HHRA) report for SSFL, in accordance with a California Water Code Section 13383 Order from the Los Angeles Regional Water Quality Control Board dated June 24, 2015. The Order was made by the LARWQCB in response to health concerns expressed by members of the public regarding exposure to regulated discharges in the drainages near the SSFL. The HHRA Report provides a quantitative assessment of potential risks to humans exposed to stormwater at or adjacent to the site. In accordance with the Order, the analysis used conceptual exposure scenarios that are representative of realistic (but conservative) exposures that may occur immediately downstream of the SSFL property boundary over the long-term. The beneficial use designations set forth in the Los Angeles Water Quality Control Plan (Basin Plan) have been used to identify the surface water uses that may be relevant when establishing the HHRA exposure assumptions.

The HHRA evaluated exposures associated with non-swimming water contact recreational activities (hiking, rafting, and other limited recreational uses that fall under the Basin Plan Limited Water Contact Recreation (LREC-1) designation). Direct exposures to surface water, i.e., incidental ingestion and dermal contact, were identified as the most likely complete exposure pathways and were evaluated quantitatively in the HHRA. In addition, the inhalation pathway and the completeness of the aquatic plant and fish consumption pathways were also evaluated.

The results of this HHRA indicate that the potential recreational exposures to Constituents of Potential Concern (COPCs) in surface water runoff exiting the SSFL via Outfalls 001, 002, 008, 009, 011, 018, and 019 (the outfalls included in the HHRA study) are below levels of concern as established by the California Environmental Protection Agency and the United States Environmental Protection Agency. This includes those COPCs that have had NPDES permit limit exceedances, including lead and dioxins.

4 Stormwater Management at SSFL

Stormwater discharges from SSFL are typically captured and treated at, or upstream of, outfalls up to a design storm size. Outfalls 011 and 018 have had advanced stormwater conveyance and active treatment systems since 2011 that also use the natural storage provided by adjacent existing ponds, while Outfalls 008 and 009 use distributed source controls in lieu of the outfall-based treatment approach due to restrictive topography (tall dams would be necessary to store significant amounts of stormwater and such structures would not be feasible at those locations) and limited space near the outfalls for large footprint treatment systems.

Geosyntec (2008) prepared a hydrologic analysis for SSFL stormwater quality treatment design storms for the distributed controls. This is different from conventional design storm analyses focusing on rare, large storms, but consider rain conditions associated with most of the runoff volume and pollutant discharges. However, the stormwater controls must also be able to safely handle the extreme event flows with minimal damage. The recommendation for a site-specific design storm was the 1-year recurrence interval event (i.e., a storm of this size is anticipated to occur once every year), corresponding to 2.5 inches of rain for the 24-hour duration event, or 0.6 inches of rain for the 1-hour duration event. It was also recommended that the stormwater treatment facilities provide treatment redundancy, or multiple treatment opportunities, through treatment trains (where complementary unit processes operate in series) or through downstream treatment components that receive treated water from facilities further upstream in the watershed.

Discharges from Outfalls 001 and 002, located in the southern buffer zone, are comprised of runoff from undeveloped areas mixed with treated stormwater discharges from the Outfalls 011 and 018 advanced stormwater treatment systems. Interim Source Removal Action (ISRA) and distributed stormwater controls programs were implemented in the Outfall 008 and 009 watersheds beginning in 2009, with LARWQCB oversight and participation. This was to facilitate 2010 Permit compliance through a dual approach focusing on remediation of surface soils to thresholds defined for NPDES constituents of concern and implementation of distributed treatment controls for stormwater runoff from prioritized sub-areas. The 2010 BMP Plan (MWH 2010) was developed under the oversight of the Surface Water Expert Panel for the Outfall 008 and 009 Watersheds.

Most of the distributed stormwater controls located throughout the Outfall 009 watershed use a filter media mix developed for SSFL consisting of sand, zeolite, and granulated activated carbon (GAC) and incorporate flow equalization, sedimentation, ion exchange, and sorption treatment processes (Pitt and Clark 2010). A variety of distributed controls are used depending on available space and drainage areas, including:

  • Culvert modifications (CMs) and media filters;
  • Lower lot sedimentation and biofilter system;
  • Detention bioswales; and
  • ELV (extended launch vehicle area) treatment train.

The advanced stormwater treatment systems for runoff from the Outfall 011 and 018 watersheds, pumped flows from the northern small watersheds, and a portion of the Outfall 009 area, use combinations of coagulation, sedimentation, sorption, and filtration unit processes. These measures were supplemented by intensive erosion control and revegetation, as needed, in the watersheds.

4.1 Active stormwater treatment systems

Temporary advanced stormwater treatment systems were initially installed in 2009 for pilot testing, and permanent construction began in 2010 at Outfalls 011 and 018. Figure 12 shows the Silvernale treatment system at Outfall 018, located adjacent to an existing pond for equalizing flow rates, pretreatment by sedimentation, and storage of flows between periods of treatment system operation. A similar treatment system is located at Outfall 011, also adjacent to an existing pond.

Figure 12 Outfall 018 Silvernale stormwater treatment system and adjacent storage pond completed in 2011 (Surface Water Expert Panel and Geosyntec 2022).

Outfalls 018 and 011 advanced treatment systems were located and sized to treat stormwater from a large portion of SSFL. The Silvernale Pond and treatment system collects stormwater runoff from the 018 watershed, along with pumped stormwater from much of Areas III and IV that would otherwise leave the site at the northern outfalls (Outfalls 003 through 7, and 10), along with runoff from a portion of the paved helipad above Outfall 009 (Figure 13). Stormwater flows in excess of the pump system capacity are discharged at these northern outfalls where media bed stormwater treatment is provided before discharge.

Figure 13 Berms and pumps at helipad used to divert flows to Silvernale stormwater treatment system began in 2011 (Surface Water Expert Panel and Geosyntec 2022).

The active treatment systems are chemical addition-based treatment trains that use pH adjustments, flocculant dosing, Actiflo coagulation, and bag and sand filters for stormwater constituent of concern and particulate reductions. Chemical additions to aid the coagulation process include aluminum sulfate, sodium hydroxide (for pH adjustments), polymers, and permanganate. Captured stormwater solids are concentrated onsite and transported for offsite disposal. The treated stormwater is then discharged at the outfalls. The treatment systems operate periodically when the available storage in the ponds may not be sufficient to contain the anticipated runoff volumes from upcoming rains. These non-stormwater discharges are also monitored with results submitted to the regulatory agency. The stormwater treatment performance of these advanced treatment systems is excellent, as described in a following section of this paper.

4.2 Identification of critical subwatersheds and use of distributed stormwater controls

After the advanced stormwater controls at Outfalls 011 and 018 were implemented, additional stormwater controls were investigated for the Outfall 008 and 009 watersheds, as it was not possible to use similar treatment systems at these outfalls due to the lack of suitable areas and steep topography. The use of distributed controls at critical locations in these watersheds was therefore implemented. The Surface Water Expert Panel identified the use of culvert modifications as controls that could be implemented quickly and cost-effectively. These are located at road crossing culverts in the Outfall 009 watershed. The culverts were partially blocked with weir boards, and underdrains were installed upstream of the culverts, leaving overflows for large flows. The underdrains were surrounded with gravel drainage layers, with a layer of the stormwater treatment media developed for the SSFL contaminants of concern, and a top gravel protection layer. Upstream sedimentation pools were also used for storage and pretreatment. These were placed at locations of opportunity and sized based on the space available.

A monitoring program was started to collect stormwater samples from many other locations throughout the targeted watersheds to identify critical locations for additional distributed stormwater controls. A statistical process was developed to rank candidate locations, based on the varying amount of data available and the frequency of high concentrations of the critical constituents. This process has been described in the annual stormwater reports submitted to the Los Angeles Regional Water Quality Control Board, in prior published papers by Otto et al. (2013), and Costa et al. (2016), and in presentations at technical conferences. This process can be used to rank and identify critical locations for other situations where varying amounts of data are available with ranges of critical constituents of concern. The evaluation and ranking process was conducted yearly for about ten years, with several critical locations identified for stormwater controls each time. As the years progressed, it was determined that the remaining locations were not important pollutant sources, so the ranking process ended. However, monitoring at the stormwater controls has been on-going to measure performance and to identify maintenance needs.

The ranking methodology compares the observed stormwater concentrations to the permit limits or benchmarks, and the stormwater particulate strengths in affected vs. background areas. Particulate strengths are determined by taking the total concentrations of the constituent minus associated filtered concentrations, divided by the total suspended solids concentrations. This provides a measure of the mass of the particulate forms of the constituent per mass of suspended sediment. These values are useful in evaluating the relative strength of sediment-based pollutant sources in stormwater samples and assist in identifying potential sources of the particulate-bound constituents of concern.

Figure 14 is a map of the Outfall 008 and 009 watersheds showing the large number of sub-areas that have been monitored for constituents of concern to identify critical areas suitable for distributed stormwater controls. A total of 16 background sites (where no industrial activity was known to occur) and 68 potential distributed controls sub-areas were monitored and evaluated over several years.

Figure 14 Outfall 008 and 009 watersheds showing monitoring locations for candidate distributed stormwater controls (green labels designate background locations and blue labels designate potential distributed control locations).
(Surface Water Expert Panel and Geosyntec 2016).

Figure 15 illustrates the basic approach for evaluating the sub-area monitoring data to identify locations for distributed stormwater controls. Four priority categories are identified, with the highest priority having observed concentrations greater than both background concentrations and permit limits. Some constituents exceeded the permit limit but were generally lower than the background concentrations, falling into the second priority category. The third category included constituents that exceeded the background concentrations but were less than the permit limit, and the lowest priority category had concentrations below both the background and permit limit concentrations.

Figure 15 Example illustration of basic approach to identify priorities of constituents of concern (Costa et al. 2016).

Over the years, additional sampling locations were added while others were removed, and not all locations had flows that could be sampled during most events. Therefore, a statistically-based weighting method was used to adjust the ranking data based on the number of samples available and how they compared to the numeric limits. This methodology relies on “weighting factors” (based on the chi-square distribution corrected for small sample numbers) that are calculated for each constituent of concern for each sub-area. The constituent-specific weighting factors are summed to produce a multi-constituent score to allow relative ranking between the monitored locations, as illustrated in Figure 16.

Figure 16 Example weighting-factor calculations based on available data (Costa et al. 2016).

This process was repeated annually from 2010 through 2019 in these watersheds until no additional subwatershed areas were identified as being necessary for sub-area distributed stormwater controls (when no consistent high-priority locations were further identified). Figure 17 is an example ranking of control locations based on 2011/2012 monitoring data, while Figure 18 shows the areas within the Outfall 008 and 009 watersheds that are being treated by distributed stormwater controls that were identified using this selection methodology, and by the initial culvert modification controls.

Figure 17 Example ranking of sub-areas for distributed stormwater controls for 2011 and 2012 (Costa et al. 2016).

Figure 18 Outfall 008 and 009 watershed areas treated by distributed stormwater controls (Surface Water Expert Panel and Geosyntec 2016).

The Outfall 009 watershed is 536 acres, while the Outfall 008 watershed is 62 acres. Stormwater from about 75% of the 009 watershed and 100% of the 008 watershed areas is treated using the distributed controls. The performance of the individual controls over time was previously described by Pitt et al. (2022) and the long-term trends in stormwater quality and compliance improvements at the regulated outfalls are described in Part 2 of this paper series, and in the annual stormwater reports.

Sub-area investigations were also extended into the Outfall 001 and 002 Watersheds (considered “buffer zone” watersheds) beginning in 2019/20 to characterize runoff from both natural background areas and potentially impacted areas to identify possible causes of periodic benchmark exceedances in those areas. Sub-area samples were also collected in the Outfall 011 Watershed beginning in 2021/22 to characterize runoff from the Area I Burn Pit and other locations to identify possible causes of exceedances at Outfall 011.

Sources of constituents of concern

The next step after identifying critical sub-areas and implementing distributed stormwater controls included additional monitoring to examine stormwater sources of constituents of concern associated with widespread sources/materials, including contaminated soil associated with site industrial activities, background soils not likely affected by industrial activities, along with other potential sources such as atmospheric deposition, paved roads and parking areas, and treated wood. Appendix C of the 2022 SSFL Annual Report (Exceeding Constituent Source Investigation) submitted to the LARWQCB describes these special studies. A technical paper is currently being prepared that describes these source area analyses and outcomes, with a short summary included in the following subsection.

The sources of constituents in the stormwater that exceeded permit limits and benchmarks were investigated through multiple data analyses providing independent lines of evidence (LOE). When considered together, these tools provide a weight of evidence identifying one or more likely sources of stormwater contaminants. The various LOEs considered were:

  • Spatial patterns;
  • Particulate strengths;
  • Metal ratio fingerprinting; and
  • Dioxin congener fingerprinting

Potential sources of stormwater contaminants that were evaluated included:

  1. Onsite Soils: Soils from areas potentially impacted by former operations were characterized as part of the Resource Conservation and Recovery Act (RCRA) program and other regulatory programs, including the RCRA Feasibility Investigations (RFI) conducted across the site. Only surface soils still in place in the top 150 mm (6 in.) within each watershed were used to represent the soil’s pollutant concentrations for areas potentially impacted by former operations since these are the soils most likely to be mobilized by stormwater runoff. Note that this includes samples both within and outside of potential clean-up areas, but sample density is higher in areas with former operations. For purposes of this source investigation, potentially impacted soils are assumed to be those with a concentration above the concentrations found in the background soils. These soil samples were bulk samples and included all particle sizes, not just the smallest particles that are mobilized in stormwater (such as those <75 µm).
  2. Background Soils: Natural background soils were evaluated using monitoring results from offsite soils included in the California Department of Toxic Substances Control SSFL Background Soils Study.
  3. Pavement Solids: Particulates on pavements were collected quarterly from six sites throughout the Outfall 009 watershed during 2016-2017. The collected samples were sieved into three particle size fractions for analyses.
  4. Treated wood utility poles and adjacent soils: Treated wood utility poles and adjacent soils were evaluated by collecting samples of the treated wood utility pole material and the soil adjacent to treated wood at several locations.
  5. Atmospheric Deposition Solids: Dry atmospheric deposition solid samples were collected monthly at the SSFL Fire Station and Helipad over the course of a year during 2016-2017.

Figures 19a and 19b show example box and whisker plots comparing particulate strengths of iron and dioxin (measured as TCDD TEQ no DNQ, dioxin toxicity equivalence, excluding congeners detected but not quantified) for potential sources, locations, and outfall samples.

Figure 19a Particulate strengths of stormwater and potential sources of iron
(Surface Water Expert Panel and Geosyntec 2022).

Figure 19b Particulate strengths of stormwater and potential sources of TCDD TEQ (no DNQ) (Surface Water Expert Panel and Geosyntec 2022).

The analyses and evaluations indicated that the elevated iron and manganese concentrations are likely due to natural soils present throughout SSFL, while elevated TCDD TEQ (no DNQ) results are likely affected by contributions from localized sources. TCDD TEQ (no DNQ) exceedances are primarily from natural background soils with smaller but more concentrated contributions from impacted soils (RFI soils), treated wood poles and adjacent soils, and pavement solids. These results lead to the focus of stormwater controls (or removal) of paved areas and the treated wood poles on the site for TCDD TEQ (no DNQ) control. The removal of contaminated soil will occur with the future guidance and approval of the DTSC after their studies and analyses are completed.

Description of distributed passive stormwater controls

Distributed stormwater controls at SSFL have been implemented mainly in the Outfall 008 and 009 watersheds to treat stormwater prior to discharge. Extensive erosion and sediment controls, revegetation, stabilization of unpaved roads, and other soil stabilization activities have been implemented in all areas at SSFL, as needed, based on frequent inspections. Impervious surfaces such as buildings and parking lots have also been removed and disconnected from the drainage systems by reintroducing vegetation and replacing the buildings and paved areas with open space, effectively restoring many areas of the site to natural conditions with reduced stormwater discharges compared to the prior developed conditions.

Major structural distributed stormwater controls are described in the ISRA Performance Monitoring and BMP Monitoring for the Outfalls 008 and 009 Watersheds, 2014/2015 Rainy Season (“2015 Annual Report for Outfalls 008 and 009”) (MWH 2015), the 2015 BMP Plan (Haley & Aldrich 2015), and later annual reports. As previously noted, distributed stormwater controls have been implemented in the Outfall 008 and 009 watersheds. These include the following, listed by implementation date and showing where they were located, based on the sub-area monitoring to identify critical source areas as previously described:

  • 2009: Outfall 009 Culvert modifications (CMs) are early control options that were implemented quickly;
  • 2010: Outfall 008 ISRA excavations (interim contaminated soil removal);
  • 2011: Outfall 009 Helipad berms and pumps to divert flows to the Silvernale Advanced Stormwater System at Outfall 018;
  • 2012: Outfall 009 B-1 Sedimentation basin and media filter;
  • 2012: Outfall 009 Northern Drainage restoration measures;
  • 2012: Outfall 009 CM-9 additional improvements;
  • 2013: Outfall 009 Lower parking lot sedimentation basin and biofilter system;
  • 2013: Outfall 009 ISRA excavations (interim contaminated soil removal);
  • 2013: Outfall 009 ELV stormwater treatment train;
  • 2013: Outfall 009 LOX sandbag berms and slope drains;
  • 2015: Outfall 009 B1436 detention bioswales;
  • 2017: Outfall 009 Wattles added around poles near pavement;
  • 2017: Outfall 009 Upper parking lot media filter;
  • 2017: Outfall 009 Roadway flow diversion to CM-3;
  • 2017: Outfall 009 Administration area inlet filters;
  • 2017: Outfall 009 Enhanced erosion controls in the former shooting range area;
  • 2017: Outfall 009 Roadway flow diversion to CM-1;
  • 2018: Outfall 009 CM-1 media filter reconstruction;
  • 2019: Outfall 009 Mulch sack curb extension in lower parking lot;
  • 2020: Outfall 009 ELV and biofilter cistern power generators added;
  • 2020: Outfall 009 CM-3 check dams added and media filter reconstruction;
  • 2021: Outfall 009 ELV treatment system media filter underdrain layer reconstruction;
  • 2023: Outfall 009 Former Shooting Range Imminent and Substantial Endangerment Determination and Consent Order Clean-up; and
  • 2024: Outfalls 011 and 001 Area I Burn Pit Imminent and Substantial Endangerment Determination and Consent Order Clean-up.

The long-term trends in stormwater quality and compliance improvements at these outfalls are described in Part 2 of this paper series, and in the annual stormwater reports. The following briefly describes several types of these distributed stormwater controls.

Culvert modifications

“Culvert modifications” (CMs) were installed early in the process in 2009 and 2010 before the sub-area monitoring data were available, as these could be installed quickly. The CMs (Figure 20) are retrofits of the existing under-road culverts and include headwalls with weir boards that span the entrance to each culvert that divert stormwater through treatment media (mixture of GAC, zeolite, and sand). Twelve culvert modification systems have been installed at SSFL.

Figure 20 Culvert modifications installed in 2009 (Surface Water Expert Panel and Geosyntec 2022).

B1 Media filter and detention basin

A media filter with sediment forebays were installed upstream of an existing culvert in 2012 to capture stormwater from the adjacent hillside and roadway (Figure 21). The media filter consists of a 10 cm (4 in) layer of gravel on the surface, underlaid by a 45 cm (18 in) layer of filter media (sand, GAC, zeolite), which are on top of a 10 cm (4 in) perforated pipe surrounded by gravel. The underdrain conveys the treated stormwater to a riser overflow structure where it is discharged to the Northern Drainage. A detention basin was also installed upstream of the media filter to provide flow equalization and pretreatment solids settling of the hillside flows entering this system.

Figure 21 B-1 Sedimentation basin and media filter installed in 2012 (Surface Water Expert Panel and Geosyntec 2022).

Lower lot sediment pond and biofilter system

This system was constructed in 2013 and consists of a collection trench drain that conveys stormwater from the lower paved lot to an 85 m3 (3,000 ft3) cistern where it is then pumped to a 650 m3 (23,000 ft3) dry sediment basin and biofilter (Figure 22). The sediment basin drains to a biofilter, which discharges the treated stormwater to the Northern Drainage. The sediment basin drains half the volume in 12 hours and the remaining volume in 28 hours. The biofilter provides a minimum media contact time of 2.1 hours. The biofilter consists of a 10 cm (4 in) layer topsoil/compost vegetative support layer, 45 cm (18 in) layer of treatment media (fine filter sand, GAC, zeolite), 30 cm (12 in) gravel layer and a 20 cm (8 in) underdrain.

A plant growth pilot study identified native plants that could grow in the treatment media and survive the alternating severe conditions of being submerged for several days, followed by long dry periods (Josselyn and Stomberg 2011). When selecting the plants for the study, the following were considered:

  • Native to the region,
  • Drought tolerance to withstand long periods of no runoff entering the treatment system,
  • Survive periodic inundation for up to 48 hours,
  • Shallow root systems to prevent fouling of the perforated pipe draining the biofilter,
  • Do not go dormant during the winter wet season when the system is subject to runoff, and
  • Some species should support wildlife and pollinating insects.

The tests included planting eight specimens of each candidate perennial plant species in containers having a topsoil layer over the treatment media. The plants were subjected to two flood tests to simulate flooded conditions in the biofilter. For the flood tests, the containers with plants were placed in a basin filled to overtop the base of the soil by 75 mm. The plants were left inundated for 48 hours and then drained. The study was conducted for 128 days, from May 16 to September 20, 2011. The plants were evaluated for biomass gains, maintaining plant health (limited dead vegetation, lack of disease, and overall vigor), and rooting aggressiveness and depth.

Sedge (Carex praegracilis) and salt grass (Distichlis spicata) added the most biomass during the study and showed the fewest signs of stress from the flooding. Mugwort (Artemisia douglasiana), and California fuchsia (Epilobium canum) also added significantly to their biomass during the study but showed moderate signs of stress from flooding. Common rush (Juncus patens) gained moderate biomass during the study and showed no signs of stress from flooding. Bricklebush (Brickelia californica) also showed moderate biomass increases but with signs of stress during flooding. All the black sage died during the first or second flood test. Overall, 75–80% of the biofilter basin was planted with a mixture of sedge, salt grass, and common rush. The remaining area included bricklebush, California fuchsia, and mugwort for their pollinator value. About 700 plants were placed in the biofilter, another 600 in the dry sedimentation basin, and about 1,000 upland trees and shrubs in the surrounding area.

Figure 22 Lower parking lot sedimentation basin and biofilter installed in 2013 (biofilter area shown here) (Surface Water Expert Panel and Geosyntec 2022).

NASA ELV stormwater treatment train

The ELV (previous NASA extended launch vehicle research area) treatment train was constructed in 2013 (Figure 23). The ELV treatment train system is based on the earlier developed MCTT (Multi-Chamber Treatment Train) previously developed during EPA funded research (Pitt et al. 1999), updated using the specific SSFL treatment media. The EPA report describes the concept and sizing, and full-scale performance information at several locations of the MCTT. The stormwater captured in a sump is pumped into two open top portable sediment tanks having floating tube settlers. The sediment tanks drain by gravity to an additional open top portable media filter tank, which percolates stormwater through 45 cm (18 in) of treatment media (mixture of sand, zeolite, and GAC) before discharge through an underdrain pipe.

Figure 23 ELV treatment train installed in 2013 (Surface Water Expert Panel and Geosyntec 2022).

Detention Bioswales

Two detention bioswales were constructed in 2014, consisting of vegetated swales with subsurface storage chambers (Contech ChamberMaxx®), backfilled with 2 cm (0.8 in) stone bedding material (Figure 24). No specialized treatment media are used at the detention bioswales as they were designed as flow equalization/detention controls upgradient of the lower lot biofilter system (which contains the specialized treatment media), after the initial lower lot flows are treated. Excess water that cannot be further treated by the biofilter (during periods of high flows and when the treatment system capacity is full) is directly discharged to the Northern Drainage. Each detention bioswale drains through an outlet pipe, controlled by two orifices sized to drain the system within 72 hours.

Figure 24 Detention bioswales installed in 2014 (Surface Water Expert Panel and Geosyntec 2022).

Performance of distributed stormwater controls

The following is a brief summary of the monitored performance of the stormwater controls implemented at SSFL. The stormwater controls were sized and selected according to treatment goals (runoff volume and flow rate to be treated and constituents of concern for retention), considering site restrictions. Critical locations were identified through evaluation of monitoring results throughout the site, focusing on constituents that have historically exceeded the numeric discharge limits in the permit. The performance metrics included being able to treat significant portions of the total annual stormwater flows at the locations and reductions of the critical constituent concentrations below permit limits (although the permit limits were not applicable at internal site locations). As noted, the culvert modifications were installed early in the process before the monitoring data for the candidate locations were available as they could be installed quickly and relatively inexpensively. A monitoring program has evaluated the stormwater controls for many years, focusing on their ability to reduce the concentrations of the critical constituents and to indicate maintenance needs. Maintenance needs are evaluated through calculated accumulation of sediment at the controls, long-term performance trends, and observations of standing water after each rain. More detailed descriptions and performance information for the controls are available at:

  • Development of specialized treatment media for SSFL constituents of concern (Pitt and Clark 2010).
  • Comparison of laboratory performance tests with full-scale tests (Pitt et al. 2021).
  • Long-term performance of SSFL stormwater controls and maintenance needs (Pitt et al. 2022).
  • Regulated outfall discharge responses to site controls (Pitt et al. 2026).
  • Annual stormwater reports, including performance data (Surface Water Expert Panel and Geosyntec 2022).

Water quality samples have been collected and analyzed at inlets and outlets at many of the distributed stormwater controls in the Outfall 009 watershed. Pitt et al. (2021; 2022) describe six to nine years of monitoring results at these controls and found no degradation in performance or unusual maintenance requirements. Overall, constituent loads are being reduced due to concentration reductions, and because runoff volumes are also being reduced by pavement and building removals accompanied by revegetation and associated evapotranspiration.

Figures 25 and 26 are example graphical summaries of influent and effluent monitoring results for dioxins and lead for different types of distributed stormwater controls. The Outfall 009 2015 permit numeric effluent limits (NELs) are shown for reference only as they are not applicable at these internal monitoring locations. These plots allow a quick assessment of the performance of the various distributed stormwater controls used at SSFL. For example, the dioxin performance plot shows that the detention bioswales and lower lot sedimentation-biofilter system resulted in the largest reductions in the effluent concentrations, with most of the effluent values below the numeric effluent limits (NELs), while the influent values were mostly greater than the NELs. In contrast, the administration area inlet filter also had high influent concentrations, but the effluent concentrations do not indicate any statistically significant reductions (the concentration increases shown are likely due to typical sampling and analytical variability). These inlets direct runoff to the lower lot biofilter system for treatment before discharge and were mainly used for trash capture before the downstream treatment components. The lead plots show that most of the influent concentrations were relatively low and did not exceed the 2015 lead NEL. The culvert modifications are shown to have the highest influent concentrations, with moderate effluent concentration reductions. The CMs were generally undersized due to limited available space. The ELV treatment train had relatively low influent lead concentrations, but the effluent concentrations were further reduced to all below the NELs. Again, the papers by Pitt et al. (2022) describe the performance trends of the distributed controls for all locations and constituents in detail.

Figure 25 Stormwater control performance – Influent/effluent box plot for dioxins, 2009–2022 (Surface Water Expert Panel and Geosyntec 2022).

Figure 26 Stormwater control performance – Influent/effluent box plot for lead, 2009–2022 (Surface Water Expert Panel and Geosyntec 2022).

Stormwater controls vary in their effectiveness, as shown in Figures 25 and 26, due to such factors as the unit processes incorporated in the device, the treatment flow rates, and associated contact times. Pitt et al. (2022) evaluated the long-term performance of the distributed stormwater controls at SSFL. As the relative footprints of the treatment media area compared to the drainage area increases, greater fractions of the annual stormwater flows (calculated using a site-calibrated SWMM model) are fully treated (compared to small treatment media areas). Figure 27 compares treatment media/drainage area ratio values for some of the SSFL stormwater controls to the average portion of the stormwater flows fully treated by the stormwater controls. Media footprints of about 0.1% of the drainage area resulted in approximately half (or less) of the annual flows being fully treated, while about 0.7% was needed to provide full treatment for about 70% of the annual flows, and greater than 1% was necessary to fully treat about 90% of the annual flows. The excess flows bypassed the media treatment, with some partial treatment in the sedimentation components of the stormwater controls. The detention bioswales have the largest relative footprints compared to their drainage areas and are more consistently effective than the other controls, even without using the specialized treatment media. It should be noted that even though undersized compared to optimal conditions, the culvert modification installations provided important discharge reductions of constituents of concern. 

Figure 27 Runoff capture compared to relative size of stormwater controls (Surface Water Expert Panel and Geosyntec 2024).

Performance of active Stormwater Treatment Systems (SWTSs)

The two active SWTSs are performing well, as evidenced by compliance monitoring results at Outfalls 011 and 018, as well as reductions in concentrations observed between untreated SWTS influent and treated Outfall discharge samples.

Influent and effluent samples were obtained at the Outfall 011 and 018 advanced stormwater treatment systems to indicate the treatment performance of the systems. Table 5 shows median influent and effluent concentrations (for both Outfall 011 and 018 treatment system data combined), and the associated percentage reductions, for a selection of constituents that had mostly detectable influent concentrations. The reductions are mostly very high, with excellent effluent water quality. The Mann-Whitney p-statistics were calculated using Minitab version 21.4.2 and indicate the statistical significance of the differences in the median of the concentrations in the influent and effluent sample groups. P-values ≤ 0.05 indicate statistically significant differences with treatment, while higher p-values indicate that insufficient data are available to show a significant difference. Only limited paired influent and effluent data were available for the advanced stormwater treatment systems at the time of the preparation of this paper. The Mann-Whitney statistical test considers the amount of data and the variability of the observed concentrations when calculating the statistical significance of the differences of the elements in the data pairs. Table 5 shows that the performance of the advanced stormwater treatment systems has been consistent and very good, even considering the limited data. Most of the previous monitoring effort focused on effluent concentrations at the regulated discharges downstream of these systems, with almost complete compliance with the stormwater effluent permit limits when these are in operation. The annual stormwater reports include updated performance information as available.

Table 5 Median influent and effluent concentrations at Advanced Stormwater Treatment Systems. Summarized from multiple quarterly surface water monitoring reports (Boeing 2024f).

Constituent and units Median untreated influent concentrations Median treated effluent concentrations Percent reductions Mann-Whitney p-value
1,2,3,4,6,7,8-HpCDF (µg/L)* 1.1×10-5 4.7×10-7 96 0.01
Copper, total (µg/L) 7.5 2.4 68 0.04
Copper, filtered (µg/L) 5.0 1.5 71 0.4
Gross alpha (pCi/L) 1.9 0.6 71 0.2
Gross beta (pCi/L) 3.7 2.8 24 0.2
Iron (mg/L) 1.2 0.05 96 0.05
Lead (µg/L) 1.2 0.5 64 0.03
Manganese (µg/L) 48 11
(excluding single
very high value)
77 0.4
OCDF (µg/L)* 3.8×10-5 5.5×10-7 99 0.05
TCDD TEQ no DNQ (µg/L) 6.1×10-8 all ND 99+ n/a
(all efl ND)
Turbidity (NTU) 27 3.1 89 0.05

*NOTE: These raw compounds cannot be directly compared to site permit limits without toxicity equivalency factors (TEF) and bioaccumulation equivalency factors (BEF) applied.

These calculated statistics are mostly based on only three to six influent and effluent paired samples so there is greater uncertainty in these results compared to other data available at SSFL. On-going influent-effluent paired performance samples are being collected to increase the reliability of these results.

Figures 28a through 28c were prepared using monitoring data for SSFL as part of the annual monitoring reports submitted to the Regional Water Quality Control Board (Boeing 2024f). The figures contain grouped log-normal probability plots (except for gross alpha due to negative values), with 95% confidence intervals, created using Minitab. These plots graphically compare the influent and effluent concentrations, highlighting the data variability and consistency of the reductions in the influent concentrations. Constituents with significant (≤0.05) Mann-Whitney p-values have more data in each data category and the confidence intervals of the probability distributions for the influent and effluent sample groups are distinct with minimal overlap. Additional statistical tests examined paired influent-effluent data for each event, but insufficient data were available to complete those more robust analyses.

Figure 28a Grouped log-normal probability plots for influent and effluent lead, copper, and iron concentrations at the advanced stormwater treatment systems at SSFL. Original data submitted to the LARWQCB (Boeing 2024f).

Figure 28b Grouped log-normal probability plots for influent and effluent gross beta, gross alpha, turbidity, and manganese concentrations at the advanced stormwater treatment systems at SSFL. Original data submitted to the LARWQCB (Boeing 2024f).

Figure 28c Grouped log-normal probability plots for influent and effluent dioxin compound concentrations at the advanced stormwater treatment systems at SSFL. Original data submitted to the LARWQCB (Boeing 2024f).

Overall, the advanced stormwater treatment systems show high levels of performance for a variety of organic, metallic, and radioactive constituents. Additional performance data being collected will increase the confidence of these calculated performance indicators. These systems require significant capital as well as high operation and maintenance costs, are very labor intensive, and require manual operation and advance preparation before operation. They also require continued power and therefore produce carbon emissions. They also remove natural ions and organics from the stormwater that would be normally present in natural creek systems, potentially impacting downstream flora and fauna that depend on the natural water chemistry. These systems are likely only needed for stormwater with low permit effluent limits that are below the achievable limits of traditional housekeeping and source controls, and passive treatment structural stormwater control measures.

5 Future Work

CalEPA/DTSC is the primary regulatory agency that develops the SSFL clean-up goals and schedule, with substantial input from the public during many review periods. No additional interim clean-up actions are expected after the recent shooting range and Area I landfill operations are completed early in 2026, except for the remaining buildings in Area IV and test stand removals, before the final clean-up. The final clean-up is not expected to begin for several more years and the stormwater monitoring and treatment activities will be on-going before, during, and after the clean-up, until the site is shown to be uncontaminated through compliance monitoring at the outfalls (Geosyntec 2008; CalEPA 2024b). The soil removal operations will be extensively monitored with soil sampling at the excavation areas to ensure compliance with the clean-up goals.

The following lists some of the steps in developing the final clean-up goals and schedule, as described by DTSC (2024g):

  • Certification of the Program Environmental Impact Report,
  • Approval of data summary reports for soil investigations in DOE and NASA areas,
  • Public review of DOE and NASA draft clean-up workplans,
  • Approval of soil investigation reports for Boeing,
  • Public review of draft Boeing clean-up workplans,
  • Approval of groundwater investigation reports for all three responsible parties,
  • Public review of the groundwater draft clean-up workplans,
  • After DTSC makes a clean-up decision, Boeing must prepare implementation plans, for review and approval,
  • Clean-up can commence once DTSC reviews and approves the plans.

Table 6 shows the schedule of some of the public comment periods. There have also been many ongoing public comment periods addressing other SSFL regulatory actions. A series of public comment periods and DTSC presentations were scheduled for the winter of 2025 concerning the Program Environmental Impact Report, for example.

Table 6 Anticipated schedule of upcoming public comment periods (DTSC 2024h).

Responsible Party Document for Review Anticipated Start of Public Comment Period
Boeing Groundwater statement of basis Winter 2025
Boeing Soil statement of basis Summer 2025
NASA Groundwater Phase 1 statement of basis Fall 2024
NASA Groundwater Phase 2 statement of basis Fall 2025
NASA Soils Remedial Action Implementation Plan To be determined*
DOE Groundwater statement of basis Spring 2025
DOE Soils Remedial Action Implementation Plan To be determined*

*NOTE: the Soil Remediation Action Implementation Plan dates will be determined following the submission of data by NASA and DOE associated with their ongoing backfill and laboratory evaluation studies.

Comprehensive watershed modeling, using data collected during the stormwater monitoring with site characterization information, has started which will calculate the anticipated stormwater benefits associated with the future DTSC directed soil clean-up activities.

6 Conclusions

This paper describes a unique industrial stormwater case study for a large field laboratory with stormwater data collected over a period of about twenty-five years at regulated outfalls and at many additional locations within the watersheds to identify sources of stormwater contamination and the best locations for distributed stormwater controls. This paper is part one of a two-part set (Pitt et al. 2026) and describes the SSFL site, the historical site activities, and the interim contaminated soil and material removal activities that have been approved by the regulatory agencies, and stormwater management and resulting runoff quality that have occurred before the upcoming final DTSC guidance becomes available. Final site clean-up activities will be determined by the DTSC based on their site studies when they set the contaminated soil clean-up goals, with significant input from the stakeholders. Also described in this paper are the distributed stormwater controls and advanced physical-chemical stormwater controls on the site, and a summary of their performance.

Most members of the public and stormwater managers elsewhere may not be aware of the complex nature of such a massive clean-up operation at a contaminated industrial site, and the stormwater management tools that can be used. Also, regulatory agency personnel, and other interested parties, may be new to the area and this summary can be useful to familiarize them concerning SSFL site characteristics and history. Mostly, this paper is intended to document the long-term stormwater planning and management tools that are being used before the final clean-up operations can start.

Chemicals in SSFL soils and groundwater came from historical aerospace testing and maintenance activities at the site and energy research. The primary chemical contaminants include a variety of solvents (primarily trichloroethylene), metals and petroleum hydrocarbons. Low-level radioactive contamination resulted from the energy research activities. Solvents, containing volatile organic compounds, were used until the 1990s to clean rocket engine test equipment. These solvents were often disposed of onsite and seeped into soil, bedrock, and groundwater. The Sodium Reactor Experiment (SRE) suffered an accident in 1959 when overheating caused fuel damage in the reactor’s core. During the accident, primary power and cooling were maintained, coolant continued to circulate throughout the reactor core and the reactor vessel remained intact, preventing a meltdown, but with the release of some radioactive material. Following the accident, the SRE was repaired, and operations continued until the end of the project in 1964. The nuclear research-related programs and operations at SSFL ended in 1988.

The past aerospace and energy research activities at SSFL have ceased; ongoing activities are limited to monitoring, remediation, and restoration. Stormwater discharges from SSFL are currently regulated by the LARWQCB. Sixteen background sites (where no industrial activity was known to occur) and 68 potential distributed control sub-areas were monitored and evaluated over several years to identify locations where distributed controls were recommended. Four priority categories of sub-areas are identified, with the highest priority having observed stormwater concentrations at locations greater than both background concentrations and permit limits. Some constituents and locations exceeded the permit limit but were generally lower than the background concentrations, falling into the second priority category. The third category included constituents at locations that exceeded the background concentrations but were less than the permit limit, and the lowest priority category had concentrations at locations below both the background and permit limit concentrations. This process was repeated annually from 2010 through 2019 until no additional subwatershed areas were identified as being necessary for sub-area distributed stormwater controls (when no consistent high-priority locations were further identified). Recently, similar site-wide evaluations were initiated to identify subwatersheds associated with stormwater having mercury concentrations that may be contributing to exceedances of more restrictive discharge limits included in the most recent discharge permit.

Most of the distributed stormwater controls located throughout the Outfall 009 watershed use a filter media mix developed for SSFL consisting of sand, zeolite, and granulated activated carbon (GAC), and incorporate flow equalization, sedimentation, ion exchange, and sorption treatment processes. A variety of distributed controls are used depending on available space and drainage areas, including numerous culvert modifications and media filters, a large lower lot biofilter system, two detention bioswales, and the ELV treatment train. Six to nine years of monitoring at these controls found no degradation in performance or unusual maintenance requirements. Average and maximum effluent concentrations for the constituents of concern at the distributed controls are generally lower than the corresponding influent values. Overall, constituent loads are being reduced due to concentrations reductions, and because runoff volumes are also being reduced by pavement and building removals accompanied by revegetation and associated evapotranspiration.

After identifying critical sub-areas and implementing distributed stormwater controls, additional monitoring was conducted to examine sources of constituents of concern associated with widespread sources/materials, including contaminated soil associated with the industrial activity, background soils not affected by the industrial activity, along with other potential sources such as atmospheric deposition, paved roads and parking areas, and treated wood. Spatial patterns, particulate strengths, metal ratio fingerprinting, and dioxin congener fingerprinting were used to identify major sources potentially affecting high concentrations at the regulated outfalls. Elevated iron and manganese outfall stormwater concentrations were likely due to natural soils present throughout region. Elevated TCDD TEQ (no DNQ) outfall concentrations are likely associated with contaminated site soils, along with contributions from natural background soils with smaller but more concentrated contributions from impacted soils, treated wood poles and adjacent soils, and pavement solids. These results lead to the focus of stormwater controls (or removal) of paved areas and the treated wood poles on the site for interim dioxin control before site soil clean-up. The removal of contaminated soil will occur using future guidance and approval of the DTSC after their studies and analyses are completed.

The advanced stormwater treatment systems use combinations of coagulation, sedimentation, sorption, and filtration unit processes. Influent and effluent samples at the advanced stormwater treatment system indicate excellent treatment performance. A total of about 1,150 analyses were conducted on these samples, with most of the results below the analytical detection limits. Monitoring at these treatment systems is continuing to increase the reliability of the performance calculations and to identify any changes in their performance with time.

Stormwater monitoring at SSFL has been extensive, as required to comply with the stormwater-only NPDES discharge permit at regulated outfalls, in addition to other targeted monitoring, such as to identify sources of constituents of concern exceeding permit limits, and to verify performance of stormwater controls. Although not all management activities were able to be directly monitored for their individual benefits, the outfall monitoring over time has shown significant reductions in stormwater exceedances with the collective use of the controls (as shown in the Part 2 paper of this paper series, Pitt et al. 2026). Based on observations, modeling, and monitoring, the following are the most useful stormwater management tools used at SSFL, in order of the most effective overall stormwater benefits:

  • Interim targeted removal of contaminated soil and materials, such as in Area IV, at the former shooting range, and at the Area I land fill, along with the ISRA contaminated soil removal operations in the Outfall 008 and 009 watersheds.
  • Extensive use of erosion controls and revegetation to stabilize soils after wildfires.
  • Advanced ActiFlo stormwater treatment systems and diversion of as much of the site stormwater to these systems as possible.
  • Identification of critical subwatersheds and use of distributed stormwater controls.
  • Removal of asphalt roads and other paved areas not needed in the future to reduce stormwater discharge volumes and contaminants.
  • Removal of treated wood and utility poles no longer needed to reduce known sources of dioxins.

The stormwater management program at SSFL has also developed and described many unique and effective tools and studies that can be applied at other locations. Some of these that may be of most interest to other stormwater managers are listed below, although not all of these are described in this review paper:

  • The development and use of treatment media for targeted constituents, considering treatment flow rates and clogging issues.
  • Use of particulate strength characteristics in the stormwater and at sources, by particle size, to better understand sources, movement, and treatment of constituents of concern.
  • Use of dioxin congener, lead isotope, and metal ratio data with statistical pattern analyses to identify sources and relationships between constituent sources and stormwater quality.
  • The statistically based process to identify and rank significant subwatersheds, considering varying amounts of data and objectives, and showing how this process was used in an effective stepwise multiyear process.
  • Special source investigation studies to identify materials at the site as important pollutant contributors (asphalt, treated wood, contaminated soil, background soil, burned materials, atmospheric deposition, etc.).
  • Background watershed investigations in the region for comparison with regulated constituent characteristics.
  • Runoff losses of stormwater at storage ponds through evaporation, evapotranspiration, and infiltration.

Acknowledgements

The authors would like to thank Jeff Wokurka, Mark Spenard, Debbie Taege, Paul Costa, Lori Blair, Randy Dean, the Jacob & Hefner team, and other SSFL site staff and consultants who over the years have supported the interim contaminated material removal, and the design, implementation, maintenance, and monitoring of the stormwater treatment controls discussed in this paper, and as recommended by the SWEP. Those Geosyntec staff supporting the SWEP’s efforts and the paper’s authors with technical stormwater control design, data processing, and analysis include Dan Bourdeau, Curtis Fang, Jai Panthail, Paul Hobson, Olivia Lincoln, and Stacy Luell. We also thank the Los Angeles Regional Water Quality Control Board and staff for their continued support of the SWEP and trust in us to serve as an independent technical panel with the receiving waters and local residents’ best interests at heart. We also thank the members of the public who have attended our meetings and site visits, and who have offered comments, many of whom have been regular attendees since the SWEP started. We also thank the manuscript reviewers whose comments are greatly appreciated.

References

  1. Boeing Company. 2021a. Third Quarter 2021 NPDES Discharge Monitoring Report, Compliance File CI-6027 and NPDES No. CA0001309. Santa Susana Field Laboratory, Ventura County, California. November 15.
  2. Boeing Company. 2021b. Fourth Quarter 2021 NPDES Discharge Monitoring Report, Compliance File CI-6027 and NPDES No. CA000130. Santa Susana Field Laboratory, Ventura County, California. February 15.
  3. Boeing Company. 2022a. First Quarter 2022 NPDES Discharge Monitoring Report, Compliance File CI-6027 and NPDES No. CA0001309. Santa Susana Field Laboratory, Ventura County, California. May 15.
  4. Boeing Company. 2022b. Second Quarter 2022 NPDES Discharge Monitoring Report, Compliance File CI-6027 and NPDES No. CA0001309. Santa Susana Field Laboratory, Ventura County, California. August 15.
  5. Boeing Company. 2024a. The Boeing Co. Santa Susana Field Lab History. Accessed online: https://www.boeing.com/principles/environment/santa-susana/extraordinary-past.page
  6. Boeing Company. 2024b. The Boeing Co. Letter to the California Regional Water Quality Control Board, Clean-up and Abatement Order (2010). Accessed online: https://dtsc-ssfl.com/files/lib_interim_meas/northdrainshootingra/correspondence/65052_July_2010_Report_Northern_Drainage_and_LOX_Area_Debris_Removal,8-13-10.PDF
  7. Boeing Company. 2024c. The Boeing Co. Surface Water Interim Source Removal Action, ISRA Quarterly Progress Reports, and RWQCB Monthly ISRA Status Reports. Accessed online: https://www.boeing.com/principles/environment/santa-susana/interim-source-removal.page
  8. Boeing Company. 2024d. The Boeing Co. Boeing Santa Susana Update on Interim Source Removal Actions (ISRA). Accessed online: https://www.boeing.com/assets/pdf/aboutus/environment/santa_susana/water_quality/isra_100114_ssfl_091208.pdf
  9. Boeing Company. 2024e. The Boeing Co. Boeing Santa Susana Restoration. Background, Fact Sheets and Newsletter. Accessed online:  https://www.boeing.com/sustainability/environment/santa-susana#anchor1
  10. Boeing Company. 2024f. The Boeing Co. Quarterly Surface Water Monitoring Reports. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana/monitoring-reports#accordion-f9ee1141e6-item-ef5a41c2cf) 
  11. Boeing Company. 2024g. The Boeing Co. Surface Water Expert Panel Reports. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana/technical-reports#accordion-b1742ee2ad-item-1fdcb3435b
  12. Boeing Company. 2024h. Surface Water Interim Source Removal Action (ISRA) reports. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana/interim-source-removal#accordion-d9ccd291cd-item-5c55af1f5c
  13. Boeing Company. 2024i. Surface Water Expert Panel Public Meeting Presentations and Handouts. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana/technical-reports
  14. Boeing Company. 2024j. Santa Susana Field Laboratory FAQ. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana#anchor8
  15. Boeing Company. 2024k. Public Meeting Handouts and Presentations. Accessed online: https://www.boeing.com/sustainability/environment/santa-susana/technical-reports#accordion-b1742ee2ad-item-1fdcb3435b
  16. CalEPA. 2024a. California Environmental Protection Agency. Search Results for Santa Susana Field Laboratory. Accessed online: https://calepa.ca.gov/serp/?q=Santa+Susana+Field+Laboratory
  17. CalEPA. 2024b. California Water Boards. FAQs for Memorandum of Understanding (MOU) Between the California Regional Water Quality Control Board, Los Angeles Region (Los Angeles Water Board) and The Boeing Company (Boeing). Undated. Accessed online: https://www.waterboards.ca.gov/losangeles/santa_susana/Boeing%20SSFL%20FAQs%20for%20RB%20MOU%20with%20Boeing%205%205%2022%20(final%20on%20ltrhd)_ADAChecked.pdf
  18. CalEQA. 2024a. California Environmental Quality Act. Imminent and Substantial Endangerment Determination and Consent Order – Former Rocketdyne-Atomics International Rifle and Pistol Club Shoot Range and Overshoot Area. Accessed online: https://ceqanet.opr.ca.gov/2022040037
  19. CalEQA. 2024b. California Environmental Quality Act. Imminent and Substantial Endangerment Determination and Consent Order – Area I Burn Pit Area Clean-up. Accessed online: https://ceqanet.opr.ca.gov/2022050188
  20. Costa, P., M. Otto, and B. Steets. 2016. “Using Subcatchment Monitoring Data to Prioritize Stormwater Treatment Control Placement; a New Statistical Methodology.” Water Resources Impact 18 (2): 21–23.
  21. DOE. 2024. US Department of Energy. Clean-up at the Santa Susana Field Laboratory for DOE’s Responsibility at Area IV. Accessed online: https://www.etec.energy.gov/Operations/Operations_History.php
  22. DOE. 2024a. US Department of Energy. Sodium Reactor Experiment (SRE) Accident. Accessed online: https://www.energy.gov/etec/sodium-reactor-experiment-sre-accident
  23. DOE. 2024b. Draft Environmental Impact Statement for Remediation of Area IV and the Northern Buffer Zone of the Santa Susana Field Laboratory (Draft SSFL Area IV EIS). Department of Energy DOE/EIS-0402. January 2017. Accessed online: https://www.dtsc-ssfl.com/files/lib_doe_area_iv/DraftEISRemAIV_NBuffZone/summary/Summary.pdf
  24. DTSC. 2024a. Department of Toxic Substances Control. Santa Susana Field Laboratory (SSFL) Main Page. Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/#:~:text=DTSC%20is%20the%20lead%20regulatory%20agency%20overseeing%20the,Their%20activities%20are%20also%20described%20on%20this%20site
  25. DTSC. 2024b. Department of Toxic Substances Control. Santa Susana Field Laboratory Interim Measures. Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/ssfl_site_activities_interim_measures/?emrc=63d042deba9ba
  26. DTSC. 2024c. Department of Toxic Substances Control. Santa Susana Field Laboratory Clean-up Frequently Asked Questions. Undated. Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/santasusanafieldlabfaq/#easy-faq-379516
  27. DTSC. 2024d. SSFL Field Sampling Plan Subgroup 5; Coca Test Area, Delta Test Area, R-2 Ponds. Public Meeting. March 8, 2012. Accessed online: https://www.dtsc-ssfl.com/files/lib_pub_involve/meeting_agendas/meeting_agendas_etc/65246_SSFLNASASFP5PresPart1.pdf
  28. DTSC. 2024e. Summary of Cancer Study and Exposure Assessment Activities related to the Sana Susana Field Laboratory (Rocketdyne) Site. DTSC Site Mitigation & Restoration Program. Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/ssflcancerstudyexposureassessment/
  29. DTSC. 2024f. Santa Susana Field Laboratory Clean-up Frequently Asked Questions. Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/santasusanafieldlabfaq/
  30. DTSC. 2024g. Santa Susana Field Laboratory Clean-up Frequently Asked Questions. What are the next steps? Accessed online: https://dtsc.ca.gov/santa_susana_field_lab/santasusanafieldlabfaq/#easy-faq-348734
  31. DTSC. 2024h. Draft SSFL Public Comment Period Schedule. Accessed online: https://dtsc.ca.gov/wp-content/uploads/sites/31/2024/07/Draft-SSFL-Public-Comment-Period-Schedule.pdf
  32. Geosyntec Consultants. 2008. Design Storm Technical Memorandum. Prepared for the Los Angeles Regional Water Quality Control Board. November 3, 2008. Accessed online: https://www.boeing.com/content/dam/boeing/boeingdotcom/principles/environment/santa-susana/ents/081103_design_storm_memo.pdf
  33. Geosyntec Consultants. 2022. Post-Clean-up Stormwater Quality Modeling Work Plan. Santa Barbara, CA.
  34. Golden State Water Company. 2024. FAQ Santa Susana Field Lab (SSFL) Simi Valley Service Area. Accessed online: https://www.gswater.com/sites/main/files/file-attachments/gswc_ssfl_faq_4.2.24.pdf
  35. Haley & Aldrich, Inc. 2011. Northern Drainage Restoration, Mitigation and Monitoring Plan. Santa Susana Field Laboratory, Ventura County, California. October.
  36. Haley & Aldrich, Inc. 2015. Best Management Practices Plan. Santa Susana Field Laboratory, 5800 Woolsey Canyon Road, Canoga Park, California. File No. 40458‐071. June.
  37. Haley & Aldrich, Inc. 2021. 2021/22 Rainy Season Sampling and Analysis Plan (SAP) Updates, Best Management Practice (BMP) Monitoring Program. Submitted to the Boeing Company, Santa Susana Field Laboratory, Ventura County, California.
  38. Jacobs. 2023. RCRA Limited Corrective Measures Study Work Plan Addendum Surficial Media Operable Unit, Boeing RFI Subareas. Prepared for The Boeing Company and submitted to DTSC. June 2023. Accessed online: https://www.dtsc-ssfl.com/files/lib_feasibilitystudy/CorrectMeasurStdyRpt/70045_SMOU_CMS_WPA_Final_June2023.pdf
  39. Josselyn, M. and M. Stromberg. 2011. Results of Pilot Planting Study for BMP Soil Media. Technical Memorandum prepared for SSFL Surface Water Expert Panel. October 20, 2011.
  40. LARWQCB. 2024a. Los Angeles Regional Water Quality Control Board. Search Results for Santa Susana Field Laboratory. Accessed online: https://www.waterboards.ca.gov/losangeles/serp.html?q=Santa+Susana+Field+Laboratory
  41. LARWQCB. 2024b. Los Angeles Regional Water Quality Control Board. Information about Comprehensive Framework for Boeing’s Clean-up. Accessed online: https://www.waterboards.ca.gov/losangeles/santa_susana/SSFL_CompFramework.html
  42. LARWQCB. 2024c. Waste Discharge Requirements for the Boeing Company, Santa Susana Field Laboratory. Order No. R4-2023-0359, NPDES Number CA0001309, CI Number 6027. Accessed online: https://www.waterboards.ca.gov/rwqcb4/board_decisions/tentative_orders/individual/npdes/Boeing_Santa_Susana_Field_Lab/2023/adopted_npdes_boeing_ssfl.pdf
  43. MWH. 2010. Santa Susana Field Laboratory Surface Water Expert Panel, Geosyntec Consultants, Haley & Aldrich, Inc., and CH2M Hill. Best Management Practices (BMP) Plan, Outfalls 008 and 009 Watersheds, Santa Susana Field Laboratory, Ventura County, California. October.
  44. MWH. 2015. ISRA Performance Monitoring and BMP Monitoring for the Outfalls 008 and 009 Watersheds, 2014/2015 Rainy Season. Submitted to the Boeing Company, Santa Susana Field Laboratory, Ventura County, California.
  45. NASA. 2024a. US National Aeronautics and Space Administration. Santa Susana Field Laboratory Environmental Clean-up and Closure – Soil Clean-up. Accessed online: https://ssfl.msfc.nasa.gov/clean-up/soil#:~:text=NASA%20has%20completed%20its%20soil%20investigation%20in%20NASA-administered,the%20investigation%20in%20a%202017%20Data%20Summary%20Report
  46. NASA. 2024b. US National Aeronautics and Space Administration. Santa Susana Field Laboratory Environmental Clean-up and Closure – News. Accessed online: https://ssfl.msfc.nasa.gov/news#news20220407
  47. NASA. 2024c. US National Aeronautics and Space Administration. Santa Susana Field Laboratory, Environmental Clean-up and Closure, frequently asked questions. Undated. Accessed online: https://ssfl.msfc.nasa.gov/about/faq
  48. NASA. 2024d. US National Aeronautics and Space Administration. News on Santa Susana Field Laboratory Environmental Clean-up and Closure. Accessed online: https://ssfl.msfc.nasa.gov/news#news20220407
  49. NASA. 2024e. Record of Decision. Supplemental Environmental Impact Statement for Soil Clean-up Activities at Santa Susana Field Laboratory, Ventura County, California. Final. NASA. September 2020. Accessed online: https://netspublic.grc.nasa.gov/main/4.03.001_SSFL%20SEIS%20ROD%20signed.pdf
  50. NASA. 2024f. Santa Susana Field Laboratory Clean-up Frequently Asked Questions. Accessed online: https://ssfl.msfc.nasa.gov/about/faq
  51. Otto, M., P. Hobson, R. Kampalath, B. Steets, R. Pitt, J. Jones, M. Stenstrom, et al. 2013. “A New Statistical Methodology: Using Subcatchment Monitoring Data to Prioritize Placement of Stormwater Treatment Controls.” Stormwater Magazine August 01. Accessed online: https://www.researchgate.net/publication/269110886_Stormwater_Magazine
  52. Pitt, R. and S. Clark. 2010. Evaluation of Biofiltration Media for Engineered Natural Treatment Systems. Geosyntec Consultants and The Boeing Co., 1050 pages. June 5, 2010. Accessed online: http://www.boeing.com/aboutus/environment/santa_susana/water_quality/tech_reports/techreports_10-10-19_FinalMediaReport051010.pdf
  53. Pitt, R., M. Colyar, A. Questad, S. Isaac, B. Steets, R. Gearheart, J. Jones, M. Josselyn, and M.K. Stenstrom. 2026. “Outfall quality changes over twenty-five years at an industrial site in response to stormwater controls, Part 2.” Journal of Water Management Modeling 34, C602. https://doi.org/10.14796/JWMM.C602
  54. Pitt, R., M. Otto, A. Questad, S. Isaac, M. Colyar, B. Steets, R. Gearheart, et al. 2021. “Laboratory Media Test Comparisons to Long-Term Performance of Biofilter and Media Filter Treatment-Train Stormwater Controls.” Journal of Sustainable Water in the Built Environment 7 (4): 04021015.
  55. Pitt, R., M. Otto, A. Questad, S. Isaac, M. Colyar, B. Steets, R. Gearheart, et al. 2022. “Performance Changes during Long-Term Monitoring of Full-Scale Media Filter Stormwater Controls at an Industrial Site.” Journal of Sustainable Water in the Built Environment 8 (1): 04021019.
  56. Pitt, R., B. Robertson, P. Barron, A. Ayyoubi, and S. Clark. 1999. Stormwater Treatment at Critical Areas: The Multi-Chambered Treatment Train (MCTT). U.S. Environmental Protection Agency, Wet Weather Flow Management Program, National Risk Management Research Laboratory. EPA/600/R-99/017. Cincinnati, Ohio. 505 pgs. March 1999.
  57. Santa Susana Surface Water Expert Panel and Geosyntec Consultants. 2015a. Site-Wide Stormwater Work Plan and 2014/15 Annual Report. The Boeing Company, Santa Susana Field Laboratory, Ventura County, CA. September.
  58. Santa Susana Surface Water Expert Panel and Geosyntec Consultants. 2015b. Special Monitoring Studies for the 009 Watershed. November 2. Updated January 20, 2016. Updated March 17, 2016. Updated August 10, 2016.
  59. Santa Susana Surface Water Expert Panel and Geosyntec Consultants. 2022. Site-Wide Stormwater Work Plan and 2021/22 Annual Report. The Boeing Company, Santa Susana Field Laboratory, Ventura County, CA. September.
  60. Surface Water Expert Panel. 2023. Santa Susana Field Laboratory (SSFL) Site -Wide Stormwater Public Meeting November 29, 2023, presentation. Accessed online: https://www.boeing.com/content/dam/boeing/boeingdotcom/principles/environment/santa-susana/water_quality/tech_reports/2023-SSFL-Public-Meeting-Slides.pdf
  61. Surface Water Expert Panel and Geosyntec. 2016. Annual Report. Santa Susana Field Laboratory Site-Wide Stormwater Annual Report 2015/2316 Reporting Year. Accessed online: https://www.boeing.com/content/dam/boeing/boeingdotcom/principles/environment/santa-susana/water_quality/tech_reports/expert_panel_annual_report_2016.pdf
  62. Surface Water Expert Panel and Geosyntec. 2019. July 17, 2019. SSFL Stormwater Expert Panel Public Meeting presentation. Accessed online: https://www.dtsc-ssfl.com/files/lib_surface_water/surface_water/ExpertPanelPresentation_071719.pdf
  63. Surface Water Expert Panel and Geosyntec. 2022. Annual Report. Santa Susana Field Laboratory Site-Wide Stormwater Annual Report 2021/22 Reporting Year. Accessed online: https://www.boeing.com/content/dam/boeing/boeingdotcom/principles/environment/pdf/2021-22-SSFL-Stormwater-Annual-Report_full.pdf
  64. Surface Water Expert Panel and Geosyntec. 2023. Annual Report. Santa Susana Field Laboratory Site-Wide Stormwater Annual Report 2022/23 Reporting Year. Accessed online: https://www.boeing.com/content/dam/boeing/boeingdotcom/principles/environment/santa-susana/water_quality/tech_reports/2022-23-SSFL-Annual-Report.pdf
  65. Surface Water Expert Panel and Geosyntec. 2024. Annual Report. Santa Susana Field Laboratory Site-Wide Stormwater Annual Report 2023/24 Reporting Year.
  66. Wikipedia. 2024. Sodium Reactor Experiment. Accessed online: https://en.wikipedia.org/wiki/Sodium_Reactor_Experiment

Image


ABOUT THIS PAPER
CITED BY (CROSSREF)
1
VIEWS
143

PAPER INFO

Identification

CHI ref #: C600 205922
Volume: 34
DOI: https://doi.org/10.14796/JWMM.C600
Cite as: JWMM 34: C600

Publication History

Received: May 07, 2024
1st decision: July 09, 2024
Accepted: August 05, 2026
Published: October 21, 2026

Status

Reviewers: 2
Version: Final published

Copyright

© Pitt et al. 2026
Some rights reserved.

License

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

The Journal of Water Management Modeling is an open-access (OA) publication. Open access means that articles and papers are available without barriers to all who could benefit from them. Practically speaking, all published works will be available to a worldwide audience, free, immediately on publication. As such, JWMM can be considered a Diamond, Gratis OA journal.

All papers published in the JWMM are licensed under a Creative Commons Attribution 4.0 International License (CC BY).

JWMM content can be downloaded, printed, copied, distributed, and linked-to, when providing full attribution to both the author/s and JWMM.


AUTHORS

Robert E. Pitt

University of Alabama (retired), Tuscaloosa, AL, USA
Contribution: Conception and design, Acquisition of data, Analysis and interpretation of data, Drafting or revising article and Critical review of article
For correspondence: rpitt493@gmail.com
No competing interests declared
ORCiD:

M. Straight

GeoSyntec Consultants, Santa Barbara, CA, USA
Contribution: Acquisition of data, Analysis and interpretation of data, Drafting or revising article and Critical review of article
No competing interests declared
ORCiD:

S. Isaac

GeoSyntec Consultants, Santa Barbara, CA, USA
Contribution: Acquisition of data
No competing interests declared
ORCiD:

Brandon Steets

GeoSyntec Consultants, Santa Barbara, CA, USA
Contribution: Conception and design, Analysis and interpretation of data and Critical review of article
No competing interests declared
ORCiD:

Megan Otto

GeoSyntec Consultants, Santa Barbara, CA, USA
Contribution: Acquisition of data, Analysis and interpretation of data and Drafting or revising article
No competing interests declared
ORCiD:

Robert Gearheart

California State Polytechnic University, Arcata, CA, USA
Contribution: Critical review of article
No competing interests declared
ORCiD:

Jonathan Jones

Wright Water Engineers Inc., Denver, CO, USA
Contribution: Critical review of article
No competing interests declared
ORCiD:

Michael Josselyn

WRA Consultants, San Rafael, CA, USA
Contribution: Critical review of article
No competing interests declared
ORCiD:

Michael K. Stenstrom

University of California, Los Angeles, CA, USA
Contribution: Critical review of article
No competing interests declared
ORCiD:

ADDITIONAL DATA

 wait

DISCUSSION

Be the first to comment.

RELATED PAPERS

 wait


TAGS

 wait

Connect With Us

Journal of Water Management Modeling (JWMM)
ISSN: 2292-6062

  info@chijournal.org

147 Wyndham St. N., Ste. 202
Guelph, Ontario, Canada, N1H 4E9
About JWMM

Mission and intent

Editorial board

Review process

Disclaimer

Privacy policy

For Authors

Guide for authors

Submit your paper

Author checklist

JWMM paper template

Reference guide

Unit conversion table

For Reviewers

Guide for reviewers

Reviewing guidelines

Criteria to be used

Standards of acceptance


Copyright 2026 by CHI